OVERVIEW OF THE “CONSTRUCTION PROCESS EVALUATING SYSTEM OF CONTRACTOR”

碩士 === 中華大學 === 土木工程學系碩士班 === 88 === ABSTRACT Since 1993, Water Conservancy Agency had been to carry out the “Construction Process Evaluating System of Contractor”. Recently, the factors that affect this system were changed so much, including the construction environment, the r...

Full description

Bibliographic Details
Main Authors: CHIANG YU JEN, 江友仁
Other Authors: YANG CHAU PANG
Format: Others
Language:zh-TW
Published: 2000
Online Access:http://ndltd.ncl.edu.tw/handle/07927225349425349492
id ndltd-TW-088CHPI0015012
record_format oai_dc
spelling ndltd-TW-088CHPI00150122015-10-13T11:50:51Z http://ndltd.ncl.edu.tw/handle/07927225349425349492 OVERVIEW OF THE “CONSTRUCTION PROCESS EVALUATING SYSTEM OF CONTRACTOR” 水利處承包商施工評鑑制度之研究 CHIANG YU JEN 江友仁 碩士 中華大學 土木工程學系碩士班 88 ABSTRACT Since 1993, Water Conservancy Agency had been to carry out the “Construction Process Evaluating System of Contractor”. Recently, the factors that affect this system were changed so much, including the construction environment, the revising decrees and rules etc. So this system became hard to proceed nowadays. In this study, we interviewed many specialists and engineers about this system, and we got many useful opinions from them. We analyzed and combined these ideas, then proposed the optimum plan to improve this system. We hope the concepts from this study can be implemented to this system, and make all constructions achieve the goal of optimum quality, the shortest construction interval and the best efficiency. YANG CHAU PANG 楊朝平 2000 學位論文 ; thesis 138 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 中華大學 === 土木工程學系碩士班 === 88 === ABSTRACT Since 1993, Water Conservancy Agency had been to carry out the “Construction Process Evaluating System of Contractor”. Recently, the factors that affect this system were changed so much, including the construction environment, the revising decrees and rules etc. So this system became hard to proceed nowadays. In this study, we interviewed many specialists and engineers about this system, and we got many useful opinions from them. We analyzed and combined these ideas, then proposed the optimum plan to improve this system. We hope the concepts from this study can be implemented to this system, and make all constructions achieve the goal of optimum quality, the shortest construction interval and the best efficiency.
author2 YANG CHAU PANG
author_facet YANG CHAU PANG
CHIANG YU JEN
江友仁
author CHIANG YU JEN
江友仁
spellingShingle CHIANG YU JEN
江友仁
OVERVIEW OF THE “CONSTRUCTION PROCESS EVALUATING SYSTEM OF CONTRACTOR”
author_sort CHIANG YU JEN
title OVERVIEW OF THE “CONSTRUCTION PROCESS EVALUATING SYSTEM OF CONTRACTOR”
title_short OVERVIEW OF THE “CONSTRUCTION PROCESS EVALUATING SYSTEM OF CONTRACTOR”
title_full OVERVIEW OF THE “CONSTRUCTION PROCESS EVALUATING SYSTEM OF CONTRACTOR”
title_fullStr OVERVIEW OF THE “CONSTRUCTION PROCESS EVALUATING SYSTEM OF CONTRACTOR”
title_full_unstemmed OVERVIEW OF THE “CONSTRUCTION PROCESS EVALUATING SYSTEM OF CONTRACTOR”
title_sort overview of the “construction process evaluating system of contractor”
publishDate 2000
url http://ndltd.ncl.edu.tw/handle/07927225349425349492
work_keys_str_mv AT chiangyujen overviewoftheconstructionprocessevaluatingsystemofcontractor
AT jiāngyǒurén overviewoftheconstructionprocessevaluatingsystemofcontractor
AT chiangyujen shuǐlìchùchéngbāoshāngshīgōngpíngjiànzhìdùzhīyánjiū
AT jiāngyǒurén shuǐlìchùchéngbāoshāngshīgōngpíngjiànzhìdùzhīyánjiū
_version_ 1716849283769040896