以修正劍河模式探討隧道開挖之地盤反應行為研究

碩士 === 中華大學 === 土木工程學系碩士班 === 88 === During processing the tunnel excavation and support construction on the soft rocks, the major controlling variables of the timing of setting up the support system are the pre-estimation and control of ground response. Among them, the advancing effects...

Full description

Bibliographic Details
Main Author: 蕭伊珍
Other Authors: 李煜舲
Format: Others
Language:zh-TW
Published: 2000
Online Access:http://ndltd.ncl.edu.tw/handle/07375841186532361930