以修正劍河模式探討隧道開挖之地盤反應行為研究
碩士 === 中華大學 === 土木工程學系碩士班 === 88 === During processing the tunnel excavation and support construction on the soft rocks, the major controlling variables of the timing of setting up the support system are the pre-estimation and control of ground response. Among them, the advancing effects...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2000
|
Online Access: | http://ndltd.ncl.edu.tw/handle/07375841186532361930 |