A Tool Portfolio Planning Method with Consideration of Both Technology Shifting and Economical Viewpoint
碩士 === 國立臺灣大學 === 工業工程學研究所 === 87 === This research presents a tool portfolio planning method, with technical and economical consideration aspects, to facilitate tool procurement planning in hi-tech industry. Within these aspects, different tools work on different technical processes result in diff...
Main Authors: | Jia-Tse Hung, 洪嘉澤 |
---|---|
Other Authors: | Feng-Cheng Yang |
Format: | Others |
Language: | zh-TW |
Published: |
1999
|
Online Access: | http://ndltd.ncl.edu.tw/handle/90912165337826999955 |
Similar Items
-
Solving Resource Portfolio Planning Model with Consideration of Both Ability Shifting and Economical Viewpoint and Job Shop Scheduling Problem by Genetic Algorithms
by: Yang, Shu-Jung, et al.
Published: (2001) -
The research for the feed-back from the bridge management system to the planning and design stages in the bridge system
by: Chia-Tse Hung, et al.
Published: (2009) -
A Decision Model for Tool Portfolio Planning in Semiconductor Manufacturing
by: WU, CHENG-HUNG, et al.
Published: (2000) -
The Study of Road Engineering and Management System Using Ontology Technology and Data Mining in Taipei Metropolitan Area
by: Chia-Tse Hung, et al.
Published: (2014) -
A Tool Portfolio Planning Methodology for Semiconductor Manufacturing
by: Ren-Chyi You, et al.
Published: (1999)