A Study of Rework Strategies and Dispatching Rules for Photolithography in Wafer Fabrication Factories

碩士 === 國立交通大學 === 工業工程與管理系 === 87 === In wafer fabrication, the material of wafer and machine cost is expensive. To increase the wafer yield, defective wafers produced during the process need to be repaired as possible. However, rework of wafer is only allowed in the photolithography area of a wafe...

Full description

Bibliographic Details
Main Authors: Lin Shih Hsing, 林世星
Other Authors: Sha Yung Jye
Format: Others
Language:zh-TW
Published: 1999
Online Access:http://ndltd.ncl.edu.tw/handle/40589385908833161311
id ndltd-TW-087NCTU0031018
record_format oai_dc
spelling ndltd-TW-087NCTU00310182016-07-11T04:13:34Z http://ndltd.ncl.edu.tw/handle/40589385908833161311 A Study of Rework Strategies and Dispatching Rules for Photolithography in Wafer Fabrication Factories 晶圓製造廠微影黃光區再加工策略與派工法則之研究 Lin Shih Hsing 林世星 碩士 國立交通大學 工業工程與管理系 87 In wafer fabrication, the material of wafer and machine cost is expensive. To increase the wafer yield, defective wafers produced during the process need to be repaired as possible. However, rework of wafer is only allowed in the photolithography area of a wafer fabrication factory. If any defective wafer produced during the process which is not in the photolithography area ought to be scrapped. In addition, it is necessary to consider some important performance measures in a wafer fabrication factory such as WIP level, production cycle time, product due date…etc. Therefor, this study studies several rework strategies and dispatching rules which are often used in a fabs. The proper rework model is then suggested. In this study, five rework strategies and five conventional dispatching rules are discussed. The five rework strategies are: 1.hold the mother lot while the child lot is reworked, and then complete the lot before moving it to the next location. 2.proceed the mother lot, and introduce a new child lot into the facility after finishing rework. 3.proceed the mother lot, and introduce a new lot composed of numerous child lots when a predefined number of wafers have accumulated. 4.proceed the mother lot, and add the reworked wafers to the next mother lot of the same product. 5.proceed the mother lot, while reworking the child lot immediately and completing the lot in some latter process. Five dispatching rules: FIFO, EDD, SPT, SRPT, and CR+ are used. A simulation model is developed to determine the performance of the combinations of rework strategies and dispatching rules. Sha Yung Jye 沙永傑 1999 學位論文 ; thesis 56 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 工業工程與管理系 === 87 === In wafer fabrication, the material of wafer and machine cost is expensive. To increase the wafer yield, defective wafers produced during the process need to be repaired as possible. However, rework of wafer is only allowed in the photolithography area of a wafer fabrication factory. If any defective wafer produced during the process which is not in the photolithography area ought to be scrapped. In addition, it is necessary to consider some important performance measures in a wafer fabrication factory such as WIP level, production cycle time, product due date…etc. Therefor, this study studies several rework strategies and dispatching rules which are often used in a fabs. The proper rework model is then suggested. In this study, five rework strategies and five conventional dispatching rules are discussed. The five rework strategies are: 1.hold the mother lot while the child lot is reworked, and then complete the lot before moving it to the next location. 2.proceed the mother lot, and introduce a new child lot into the facility after finishing rework. 3.proceed the mother lot, and introduce a new lot composed of numerous child lots when a predefined number of wafers have accumulated. 4.proceed the mother lot, and add the reworked wafers to the next mother lot of the same product. 5.proceed the mother lot, while reworking the child lot immediately and completing the lot in some latter process. Five dispatching rules: FIFO, EDD, SPT, SRPT, and CR+ are used. A simulation model is developed to determine the performance of the combinations of rework strategies and dispatching rules.
author2 Sha Yung Jye
author_facet Sha Yung Jye
Lin Shih Hsing
林世星
author Lin Shih Hsing
林世星
spellingShingle Lin Shih Hsing
林世星
A Study of Rework Strategies and Dispatching Rules for Photolithography in Wafer Fabrication Factories
author_sort Lin Shih Hsing
title A Study of Rework Strategies and Dispatching Rules for Photolithography in Wafer Fabrication Factories
title_short A Study of Rework Strategies and Dispatching Rules for Photolithography in Wafer Fabrication Factories
title_full A Study of Rework Strategies and Dispatching Rules for Photolithography in Wafer Fabrication Factories
title_fullStr A Study of Rework Strategies and Dispatching Rules for Photolithography in Wafer Fabrication Factories
title_full_unstemmed A Study of Rework Strategies and Dispatching Rules for Photolithography in Wafer Fabrication Factories
title_sort study of rework strategies and dispatching rules for photolithography in wafer fabrication factories
publishDate 1999
url http://ndltd.ncl.edu.tw/handle/40589385908833161311
work_keys_str_mv AT linshihhsing astudyofreworkstrategiesanddispatchingrulesforphotolithographyinwaferfabricationfactories
AT línshìxīng astudyofreworkstrategiesanddispatchingrulesforphotolithographyinwaferfabricationfactories
AT linshihhsing jīngyuánzhìzàochǎngwēiyǐnghuángguāngqūzàijiāgōngcèlüèyǔpàigōngfǎzézhīyánjiū
AT línshìxīng jīngyuánzhìzàochǎngwēiyǐnghuángguāngqūzàijiāgōngcèlüèyǔpàigōngfǎzézhīyánjiū
AT linshihhsing studyofreworkstrategiesanddispatchingrulesforphotolithographyinwaferfabricationfactories
AT línshìxīng studyofreworkstrategiesanddispatchingrulesforphotolithographyinwaferfabricationfactories
_version_ 1718343248858054656