A Study of Inspection Stations Allocation Problem of Re-entrant Production Systems with Dispatching Rules Consideration
碩士 === 中原大學 === 工業工程學系 === 87 === This research is to study the allocation problem of inspection stations for re-entrant production systems. Five dispatching rules: FCFS, CR, EDD, SPT and LTR are used for the evaluation of the allocation problem with the performance indices of total manufacturing c...
Main Author: | 許世昌 |
---|---|
Other Authors: | 饒忻 |
Format: | Others |
Language: | zh-TW |
Published: |
1999
|
Online Access: | http://ndltd.ncl.edu.tw/handle/84954617294888354942 |
Similar Items
-
A Study of Inspection Stations Allocation Problem of Re-entrant Production Systems
by: Liu- John, et al.
Published: (1998) -
A Study of Inspection Stations Allocation Problem of Production Systems
by: Yung-Hung Chu, et al.
Published: (2001) -
Learning to Dispatch Operations with Intentional Delay for Re-Entrant Multiple-Chip Product Assembly Lines
by: Jaeseok Huh, et al.
Published: (2018-11-01) -
A Study on The Allocation of Inspection Stations in Production Systems
by: Chaur-Cheng Wang, et al. -
Research on the Hybrid Genetic Algorithm in Re-entrant Flow Shop and Re-entrant Permutation Flow Shop Problems
by: Chan-Min Lin, et al.
Published: (2003)