Computation Productivity of the telecommunication pipe path engineering And Build Information System

碩士 === 中華大學 === 土木工程學系碩士班 === 87 === Abstract Because the inland construct market is limited , but the company continual increase . At this situation not easy to get engineering , and low price to get engineering make the account abase , and management quality and resources...

Full description

Bibliographic Details
Main Authors: Weio Tseng, 曾偉
Other Authors: Jen-Chieh Liu
Format: Others
Language:zh-TW
Published: 1999
Online Access:http://ndltd.ncl.edu.tw/handle/75004038333457762797
id ndltd-TW-087CHPI0015018
record_format oai_dc
spelling ndltd-TW-087CHPI00150182016-02-03T04:32:22Z http://ndltd.ncl.edu.tw/handle/75004038333457762797 Computation Productivity of the telecommunication pipe path engineering And Build Information System 電信管道工程生產力評估與資訊系統建立之研究 Weio Tseng 曾偉 碩士 中華大學 土木工程學系碩士班 87 Abstract Because the inland construct market is limited , but the company continual increase . At this situation not easy to get engineering , and low price to get engineering make the account abase , and management quality and resources naught effectual advance , hope don't to influence architecture basic function, quality ,and owner demand.It is also try to take better economics , efficiency and low cost , than original engineering plan and try to make higher value. This text is explore human machine and material of engineering , each relative resources to effective assort , that can raise high productivity.This text for instance use telecommunication subsurface project, how to preferment the productivity and artifice. Keyword:telecommunication pipe path engineering productivity、cycle time。 Jen-Chieh Liu Shyi-Lin Lee 劉俊杰 李錫霖 1999 學位論文 ; thesis 180 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 中華大學 === 土木工程學系碩士班 === 87 === Abstract Because the inland construct market is limited , but the company continual increase . At this situation not easy to get engineering , and low price to get engineering make the account abase , and management quality and resources naught effectual advance , hope don't to influence architecture basic function, quality ,and owner demand.It is also try to take better economics , efficiency and low cost , than original engineering plan and try to make higher value. This text is explore human machine and material of engineering , each relative resources to effective assort , that can raise high productivity.This text for instance use telecommunication subsurface project, how to preferment the productivity and artifice. Keyword:telecommunication pipe path engineering productivity、cycle time。
author2 Jen-Chieh Liu
author_facet Jen-Chieh Liu
Weio Tseng
曾偉
author Weio Tseng
曾偉
spellingShingle Weio Tseng
曾偉
Computation Productivity of the telecommunication pipe path engineering And Build Information System
author_sort Weio Tseng
title Computation Productivity of the telecommunication pipe path engineering And Build Information System
title_short Computation Productivity of the telecommunication pipe path engineering And Build Information System
title_full Computation Productivity of the telecommunication pipe path engineering And Build Information System
title_fullStr Computation Productivity of the telecommunication pipe path engineering And Build Information System
title_full_unstemmed Computation Productivity of the telecommunication pipe path engineering And Build Information System
title_sort computation productivity of the telecommunication pipe path engineering and build information system
publishDate 1999
url http://ndltd.ncl.edu.tw/handle/75004038333457762797
work_keys_str_mv AT weiotseng computationproductivityofthetelecommunicationpipepathengineeringandbuildinformationsystem
AT céngwěi computationproductivityofthetelecommunicationpipepathengineeringandbuildinformationsystem
AT weiotseng diànxìnguǎndàogōngchéngshēngchǎnlìpínggūyǔzīxùnxìtǒngjiànlìzhīyánjiū
AT céngwěi diànxìnguǎndàogōngchéngshēngchǎnlìpínggūyǔzīxùnxìtǒngjiànlìzhīyánjiū
_version_ 1718177474341240832