Study on The Defects of The Construction, Operation and Closure of The Sanitary Landfill

碩士 === 淡江大學 === 水資源及環境工程學系 === 86 === Abstract:Incineration is the first priority, landfill, however, the secondary one in the waste treatment policy. Nevertheless, the ash generated from the incineration process requires further disposal. Therefore, land...

Full description

Bibliographic Details
Main Authors: TUAN, CHIN-YIH, 段晉義
Other Authors: GAO SIA-HUAI
Format: Others
Language:zh-TW
Published: 1998
Online Access:http://ndltd.ncl.edu.tw/handle/15293458489484264397
id ndltd-TW-086TKU01088007
record_format oai_dc
spelling ndltd-TW-086TKU010880072015-10-13T17:34:45Z http://ndltd.ncl.edu.tw/handle/15293458489484264397 Study on The Defects of The Construction, Operation and Closure of The Sanitary Landfill 垃圾衛生掩埋場興建、操作營運及封閉管理缺失之探討 TUAN, CHIN-YIH 段晉義 碩士 淡江大學 水資源及環境工程學系 86 Abstract:Incineration is the first priority, landfill, however, the secondary one in the waste treatment policy. Nevertheless, the ash generated from the incineration process requires further disposal. Therefore, landfill is still the final solution for solving the waste treatment problems .Owing to the residents* protest caused by the "NIMBY" syndrome, a landfill site is difficult to llocate. In order to prolong the life span of a landfill, the implementation of waste reduction and recycling program, to some extenVia interview, data collection and statistics, this study investigates the common defects occurred in the three stages of the landfill, and examines if the common defects being improved or corrected during different stages. This study also considers the cause of the defects, and suggests proper solutions to avoid the deterioration of the construction quality and secondary pollution. Above all, this study will serve as a management guideline for construction, maintenance and closure of a general waste/ash laResults show that in the construction stage, the improper monitoring of the site preparation and main construction results in the deterioration of the construction quality. Besides, the poor site safety management caused the poor environment sanitation. In the second stage, improper operation and maintenance of the pollution control facilities, high volume industrial waste in the landfill, lacking of environmental monitoring system and poor employee training originate the odor, waste water overflow, methaneAll the defects shown in this study reveals high duplication with the former studies. It shows that there are no proper control of these problem, in spite of the awareness. It is important that a management and control strategy of the construction, operation, maintenance and closure of the landfill should be built up. In addition, a tracking and following up system should be implemented for the improper managed landfills. GAO SIA-HUAI 高思懷 1998 學位論文 ; thesis 153 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 淡江大學 === 水資源及環境工程學系 === 86 === Abstract:Incineration is the first priority, landfill, however, the secondary one in the waste treatment policy. Nevertheless, the ash generated from the incineration process requires further disposal. Therefore, landfill is still the final solution for solving the waste treatment problems .Owing to the residents* protest caused by the "NIMBY" syndrome, a landfill site is difficult to llocate. In order to prolong the life span of a landfill, the implementation of waste reduction and recycling program, to some extenVia interview, data collection and statistics, this study investigates the common defects occurred in the three stages of the landfill, and examines if the common defects being improved or corrected during different stages. This study also considers the cause of the defects, and suggests proper solutions to avoid the deterioration of the construction quality and secondary pollution. Above all, this study will serve as a management guideline for construction, maintenance and closure of a general waste/ash laResults show that in the construction stage, the improper monitoring of the site preparation and main construction results in the deterioration of the construction quality. Besides, the poor site safety management caused the poor environment sanitation. In the second stage, improper operation and maintenance of the pollution control facilities, high volume industrial waste in the landfill, lacking of environmental monitoring system and poor employee training originate the odor, waste water overflow, methaneAll the defects shown in this study reveals high duplication with the former studies. It shows that there are no proper control of these problem, in spite of the awareness. It is important that a management and control strategy of the construction, operation, maintenance and closure of the landfill should be built up. In addition, a tracking and following up system should be implemented for the improper managed landfills.
author2 GAO SIA-HUAI
author_facet GAO SIA-HUAI
TUAN, CHIN-YIH
段晉義
author TUAN, CHIN-YIH
段晉義
spellingShingle TUAN, CHIN-YIH
段晉義
Study on The Defects of The Construction, Operation and Closure of The Sanitary Landfill
author_sort TUAN, CHIN-YIH
title Study on The Defects of The Construction, Operation and Closure of The Sanitary Landfill
title_short Study on The Defects of The Construction, Operation and Closure of The Sanitary Landfill
title_full Study on The Defects of The Construction, Operation and Closure of The Sanitary Landfill
title_fullStr Study on The Defects of The Construction, Operation and Closure of The Sanitary Landfill
title_full_unstemmed Study on The Defects of The Construction, Operation and Closure of The Sanitary Landfill
title_sort study on the defects of the construction, operation and closure of the sanitary landfill
publishDate 1998
url http://ndltd.ncl.edu.tw/handle/15293458489484264397
work_keys_str_mv AT tuanchinyih studyonthedefectsoftheconstructionoperationandclosureofthesanitarylandfill
AT duànjìnyì studyonthedefectsoftheconstructionoperationandclosureofthesanitarylandfill
AT tuanchinyih lājīwèishēngyǎnmáichǎngxìngjiàncāozuòyíngyùnjífēngbìguǎnlǐquēshīzhītàntǎo
AT duànjìnyì lājīwèishēngyǎnmáichǎngxìngjiàncāozuòyíngyùnjífēngbìguǎnlǐquēshīzhītàntǎo
_version_ 1717781078396108800