The Method of Acquiring t-z Curve from the Instrumentation Record of Pile Load Test
碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 86 === The purpose of this thesis is to study how to acquire the t-z curve from the instrumentation record of in-situ pile load test of HSR ( High Speed Railway ). The performance and characteristics of the t-z curve and load-distribution curve was studied through th...
Main Authors: | Lee Shae-Jeng, 李協政 |
---|---|
Other Authors: | Yun-Mei Hsiung |
Format: | Others |
Language: | zh-TW |
Published: |
1998
|
Online Access: | http://ndltd.ncl.edu.tw/handle/22247166025932526509 |
Similar Items
-
The Application of t-z Curve Modified by z-factor to Pile Loading Test Analysis
by: KUAN-CHIEH, et al.
Published: (2017) -
The methods of interpretation on ultimate capacity from pile load test curve
by: Yu Cheng-Wei, et al.
Published: (1998) -
A STUDY OF APPLYING THE THEORETICAL T-Z CURVE OF SINGLE PILE TO GROUP PILES
by: Liu Yue, et al.
Published: (1993) -
Static load test curve (Q–s) conversion in to pile of different size
by: Meyer Zygmunt, et al.
Published: (2018-06-01) -
Interpretation on pile capacity from instrumented sacrifical pile load test for deep foundation system
by: Abdul Razak, Nurul Husna
Published: (2020)