The Research of Evaluation and Renewal in Building Equipment for Existing Auditoria

碩士 === 國立臺灣科技大學 === 工程技術研究所 === 86 === The life cycle of a building is beyond sixty years, but the functions of building equipment always worsen during about ten years, and then we have to face the problem of renewal. This study is a composite research, and we will take the...

Full description

Bibliographic Details
Main Authors: Liao Wen-Lang, 廖文郎
Other Authors: Cheng Cheng-Li
Format: Others
Language:zh-TW
Published: 1998
Online Access:http://ndltd.ncl.edu.tw/handle/59110122735924009501
Description
Summary:碩士 === 國立臺灣科技大學 === 工程技術研究所 === 86 === The life cycle of a building is beyond sixty years, but the functions of building equipment always worsen during about ten years, and then we have to face the problem of renewal. This study is a composite research, and we will take the existing auditorium to be study object. At the first, we will concentrate in the problems of equipment that happened in the existing auditorium. On the other hand, we will also study the problems in the whole building systems due to the renewal of equipment. The problems of building systems include design function, structure system, acoustic system etc.. At the same time, we will also study the solution from the view point of equipment, and help the renewal of other building systems. The first year, we will investigate the circumstances of equipment system in existing building. The investigation topics include air condition, water supply and drainage, electricity etc.. Then we will put these problems in order, and concentrate in the important point to analyze independently and value in general. Furthermore, we will also study the contemporary new development of building equipment, and link them to our study. The second year, according to the conclusion of the first year''s analysis, we will continue to study the solution of these circumstance problems, and try to conclude some rules. At the last, we will practice some real projects, from independent equipment topic to composite building system, and feed back to the solution and analysis. Using this looping practice, we will propose a promotion counter plan and build the rules that could be followed for the renewal of existing auditorium.