The Research of Object-Oriented Techinique Applied on Engineering Cost-Control

碩士 === 國立臺灣大學 === 土木工程學研究所 === 86 ===   Many construction information systems were developed and operated on site today. These information systems, due to the complexity of project situation, should be modified before applied into every project. In these systems, many cost control methodologies wer...

Full description

Bibliographic Details
Main Author: 楊王進
Other Authors: 王明德
Format: Others
Language:zh-TW
Published: 1998
Online Access:http://ndltd.ncl.edu.tw/handle/38421904799398014856
id ndltd-TW-086NTU03015002
record_format oai_dc
spelling ndltd-TW-086NTU030150022016-06-29T04:13:55Z http://ndltd.ncl.edu.tw/handle/38421904799398014856 The Research of Object-Oriented Techinique Applied on Engineering Cost-Control 物件導向技術在工程成本控制應用之研究─以估驗計價為例 楊王進 碩士 國立臺灣大學 土木工程學研究所 86   Many construction information systems were developed and operated on site today. These information systems, due to the complexity of project situation, should be modified before applied into every project. In these systems, many cost control methodologies were operated based on scheduling schema. But these cost estimating and payments, presuming there are pure logic relationship between activities, are challenged by their inability to react promptly to the incident problem of changing the sequence of work now.   This research utilizes the benefits of object-oriented paradigm to develop an Object-Oriented Evaluation and Review Technique(OERT). Through WBS(Work Break-down Structure), this OERT will develop every activity of project to a complete object instance by Encapsulation", and gives it a convenient way to express their relationship discarded the concept of network by Inheritance and Aggregation".   In advance, this research develops a Object-Oriented Cost Estimating and Payments Thrust System(OOCEPTS) by Embedded SQL and language Ansi C. The developed OOCEPTS will automatically update the cash-flow, financial report, estimating subjection etc. between project activities by the matrix to CBS(Cost Breakdown Structure). Combined to engineering cost index database, no matter which data model it was, OOCEPTS should be queried and updated easily by SQL on company Over-loading OOCEPTS should be improved and extended easily. Thus even for the projects without financial specialist, a meaningful and workable cost estimating and payments can be easily constructed and kept.   The scope of this research is limited to building construction. A prototype system of the projcet model was implemented on a personal computer using a windows-based, object-oriented programming environment, Ansi C,CGI and UniSQL API interface. The prototype system incorporates several external programs for various scheduling and financial analysis purposes. 王明德 1998 學位論文 ; thesis 98 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 土木工程學研究所 === 86 ===   Many construction information systems were developed and operated on site today. These information systems, due to the complexity of project situation, should be modified before applied into every project. In these systems, many cost control methodologies were operated based on scheduling schema. But these cost estimating and payments, presuming there are pure logic relationship between activities, are challenged by their inability to react promptly to the incident problem of changing the sequence of work now.   This research utilizes the benefits of object-oriented paradigm to develop an Object-Oriented Evaluation and Review Technique(OERT). Through WBS(Work Break-down Structure), this OERT will develop every activity of project to a complete object instance by Encapsulation", and gives it a convenient way to express their relationship discarded the concept of network by Inheritance and Aggregation".   In advance, this research develops a Object-Oriented Cost Estimating and Payments Thrust System(OOCEPTS) by Embedded SQL and language Ansi C. The developed OOCEPTS will automatically update the cash-flow, financial report, estimating subjection etc. between project activities by the matrix to CBS(Cost Breakdown Structure). Combined to engineering cost index database, no matter which data model it was, OOCEPTS should be queried and updated easily by SQL on company Over-loading OOCEPTS should be improved and extended easily. Thus even for the projects without financial specialist, a meaningful and workable cost estimating and payments can be easily constructed and kept.   The scope of this research is limited to building construction. A prototype system of the projcet model was implemented on a personal computer using a windows-based, object-oriented programming environment, Ansi C,CGI and UniSQL API interface. The prototype system incorporates several external programs for various scheduling and financial analysis purposes.
author2 王明德
author_facet 王明德
楊王進
author 楊王進
spellingShingle 楊王進
The Research of Object-Oriented Techinique Applied on Engineering Cost-Control
author_sort 楊王進
title The Research of Object-Oriented Techinique Applied on Engineering Cost-Control
title_short The Research of Object-Oriented Techinique Applied on Engineering Cost-Control
title_full The Research of Object-Oriented Techinique Applied on Engineering Cost-Control
title_fullStr The Research of Object-Oriented Techinique Applied on Engineering Cost-Control
title_full_unstemmed The Research of Object-Oriented Techinique Applied on Engineering Cost-Control
title_sort research of object-oriented techinique applied on engineering cost-control
publishDate 1998
url http://ndltd.ncl.edu.tw/handle/38421904799398014856
work_keys_str_mv AT yángwángjìn theresearchofobjectorientedtechiniqueappliedonengineeringcostcontrol
AT yángwángjìn wùjiàndǎoxiàngjìshùzàigōngchéngchéngběnkòngzhìyīngyòngzhīyánjiūyǐgūyànjìjiàwèilì
AT yángwángjìn researchofobjectorientedtechiniqueappliedonengineeringcostcontrol
_version_ 1718328072576434176