Studying the Short Cycle Time and the Model of the Due Date Control for IC Packaging Factory

碩士 === 國立交通大學 === 工業工程與管理學系 === 86 ===   The most important issue of the day in the IC packaging factory is to reduce the cycle time and to deliver the goods on time. According to the productive properties, this paper starts with rope rule, split lot size, and the management of uncertainty.   The fi...

Full description

Bibliographic Details
Main Authors: Hsu, Chien-Dai, 徐千代
Other Authors: Lee, Rong-Kwei
Format: Others
Language:zh-TW
Published: 1998
Online Access:http://ndltd.ncl.edu.tw/handle/14765599072810254880

Similar Items