Studying the Short Cycle Time and the Model of the Due Date Control for IC Packaging Factory
碩士 === 國立交通大學 === 工業工程與管理學系 === 86 === The most important issue of the day in the IC packaging factory is to reduce the cycle time and to deliver the goods on time. According to the productive properties, this paper starts with rope rule, split lot size, and the management of uncertainty. The fi...
Main Authors: | Hsu, Chien-Dai, 徐千代 |
---|---|
Other Authors: | Lee, Rong-Kwei |
Format: | Others |
Language: | zh-TW |
Published: |
1998
|
Online Access: | http://ndltd.ncl.edu.tw/handle/14765599072810254880 |
Similar Items
-
The Construction of Short-Term Production Plaaning System for IC Packaging Factories
by: Su, Huang-Shyan, et al.
Published: (1998) -
Short term Order and Machine Assignment Problem for IC-Packaging Factory
by: 黃思孟
Published: (2012) -
The Study of the Interactive Due Date Commitment and Production Schedule Model in Semiconductor Packaging Factory
by: Ying-Ming Lee, et al.
Published: (2000) -
A Model Discussion for Due-date Assignment of Order Release Controlling- Based on the Example of IC Packaging Industries
by: nu-hsiu liao, et al.
Published: (1999) -
Machine Allocation Problem of IC-Packaging Factory
by: Chan, Jennifer, et al.
Published: (2011)