A Drum-Buffer-Rope System for the Capacity Constraint Resources(CCR) with Non-identical Parallel Machines and Reentrant Environment
碩士 === 中華大學 === 工業工程與管理研究所 === 86 === When we did traditional research of DBR, we assumed that Identical Parallel Machines Environment was used to do analysis. Currently the constrain of assets and development of technology, the different machines produce same product will get the different resul...
Main Author: | 林義棠 |
---|---|
Other Authors: | 吳鴻輝 |
Format: | Others |
Language: | zh-TW |
Published: |
1998
|
Online Access: | http://ndltd.ncl.edu.tw/handle/27063660347862107991 |
Similar Items
-
A Modification of Simplified Drum Buffer Rope for Reentrant Flow Shop Scheduling
by: Huang, Wen-Tso, et al.
Published: (2013) -
Application of Drum-Buffer-Rope to the Capacity Planning of Wafer Fabrication with Time Constraint
by: Yi-Lin Lai, et al.
Published: (2006) -
The Development of Drum-Buffer-Rope
by: 李國安
Published: (2002) -
The study of factors effecting constraint resource buffer(CRB) size in drum-buffer-rope(DBR) scheduling
by: Ye, Wen Bin, et al.
Published: (1994) -
A Research of Multi-Objective Parallel-Machine Drum-Buffer-Rope Job-Shop Scheduling
by: Po-Jen Hsueh, et al.
Published: (2014)