A Drum-Buffer-Rope System for the Capacity Constraint Resources(CCR) with Non-identical Parallel Machines and Reentrant Environment
碩士 === 中華大學 === 工業工程與管理研究所 === 86 === When we did traditional research of DBR, we assumed that Identical Parallel Machines Environment was used to do analysis. Currently the constrain of assets and development of technology, the different machines produce same product will get the different resul...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1998
|
Online Access: | http://ndltd.ncl.edu.tw/handle/27063660347862107991 |
id |
ndltd-TW-086CHPI3031002 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-086CHPI30310022016-01-22T04:17:04Z http://ndltd.ncl.edu.tw/handle/27063660347862107991 A Drum-Buffer-Rope System for the Capacity Constraint Resources(CCR) with Non-identical Parallel Machines and Reentrant Environment 瓶頸站異質多機與迴流環境下限制驅導式排程系統 林義棠 碩士 中華大學 工業工程與管理研究所 86 When we did traditional research of DBR, we assumed that Identical Parallel Machines Environment was used to do analysis. Currently the constrain of assets and development of technology, the different machines produce same product will get the different results of work time and precision. The condition is that different machines will be used in one work station to meet the needs of different processes and products. For example, the different machines are used in same test operation doing different products testing criteria to meet the different customers'' quality needs which exists in the Semiconduction Testing Factory. The condition was named Non-identical Parallel Machines Environment. We face two problems in this environment: (1)varieties of customers and products make us hard to predict combinations of machine set in CCR. If we consider all combinations, the system will be huge. (2)In case of same machine is used in many different machine groups to produce different products, this machine capacity will be over loaded and induce different products, this machine capacity will be over loaded and induce unbalance in production flow. Now schedule programs cannot solve these two problems in Nonidentical Parallel Machines. This research mentions both Drum in Non-identical Parallel Machines with reentrant and without reentrant to consider the drum processes reentrant under the Non-identical Parallel Machines Environment in order to extend the adaptability of the DBR. 吳鴻輝 1998 學位論文 ; thesis 78 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 中華大學 === 工業工程與管理研究所 === 86 === When we did traditional research of DBR, we assumed that Identical Parallel Machines Environment was used to do analysis. Currently the constrain of assets and development of technology, the different machines produce same product will get the different results of work time and precision. The condition is that different machines will be used in one work station to meet the needs of different processes and products.
For example, the different machines are used in same test operation doing different products testing criteria to meet the different customers'' quality needs which exists in the Semiconduction Testing Factory. The condition was named Non-identical Parallel Machines Environment. We face two problems in this environment: (1)varieties of customers and products make us hard to predict combinations of machine set in CCR. If we consider all combinations, the system will be huge. (2)In case of same machine is used in many different machine groups to produce different products, this machine capacity will be over loaded and induce different products, this machine capacity will be over loaded and induce unbalance in production flow. Now schedule programs cannot solve these two problems in Nonidentical Parallel Machines. This research mentions both Drum in Non-identical Parallel Machines with reentrant and without reentrant to consider the drum processes reentrant under the Non-identical Parallel Machines Environment in order to extend the adaptability of the DBR.
|
author2 |
吳鴻輝 |
author_facet |
吳鴻輝 林義棠 |
author |
林義棠 |
spellingShingle |
林義棠 A Drum-Buffer-Rope System for the Capacity Constraint Resources(CCR) with Non-identical Parallel Machines and Reentrant Environment |
author_sort |
林義棠 |
title |
A Drum-Buffer-Rope System for the Capacity Constraint Resources(CCR) with Non-identical Parallel Machines and Reentrant Environment |
title_short |
A Drum-Buffer-Rope System for the Capacity Constraint Resources(CCR) with Non-identical Parallel Machines and Reentrant Environment |
title_full |
A Drum-Buffer-Rope System for the Capacity Constraint Resources(CCR) with Non-identical Parallel Machines and Reentrant Environment |
title_fullStr |
A Drum-Buffer-Rope System for the Capacity Constraint Resources(CCR) with Non-identical Parallel Machines and Reentrant Environment |
title_full_unstemmed |
A Drum-Buffer-Rope System for the Capacity Constraint Resources(CCR) with Non-identical Parallel Machines and Reentrant Environment |
title_sort |
drum-buffer-rope system for the capacity constraint resources(ccr) with non-identical parallel machines and reentrant environment |
publishDate |
1998 |
url |
http://ndltd.ncl.edu.tw/handle/27063660347862107991 |
work_keys_str_mv |
AT línyìtáng adrumbufferropesystemforthecapacityconstraintresourcesccrwithnonidenticalparallelmachinesandreentrantenvironment AT línyìtáng píngjǐngzhànyìzhìduōjīyǔhuíliúhuánjìngxiàxiànzhìqūdǎoshìpáichéngxìtǒng AT línyìtáng drumbufferropesystemforthecapacityconstraintresourcesccrwithnonidenticalparallelmachinesandreentrantenvironment |
_version_ |
1718161302740795392 |