A Study on Semiconductor Manufacturing Scheduling Problems with Job Reentrant and Machine Group Constraints---Disjunctive Graph Models
碩士 === 國立中央大學 === 工業管理學系 === 85 ===
Main Authors: | Hsu, Chi-Ming, 許啟明 |
---|---|
Other Authors: | Gwo-Ji Sheen |
Format: | Others |
Language: | zh-TW |
Published: |
1997
|
Online Access: | http://ndltd.ncl.edu.tw/handle/62760659733603689279 |
Similar Items
-
A Study on Semiconductor Manufacturing Scheduling Problems with Job Reentrant and Machine Group Constraints---Disjunctive Graph Models
by: Xu, Qi-Ming, et al.
Published: (1997) -
Parallel Machine Scheduling with Minimal and Maximal Time Lags for Reentrant Job
by: Pei-Yun Chan, et al.
Published: (2007) -
No-wait Flexible Flow Shop Scheduling with Reentrant Constraints
by: HU, HAN, et al.
Published: (2019) -
A Study of Job Shop Scheduling Problem with Parallel Machine and Reentrant Process
by: Jheng-Jynn Wu, et al.
Published: (2006) -
A disjunctive graph technique for shop scheduling problems
by: Chiu, Kung-Ying
Published: (2011)