Auction-based Shop Floor Control System Design for Bearings Industry
碩士 === 國立交通大學 === 工業工程與管理學系 === 85 === Auction-based heterarchical control architecture is proposed to design a shopfloor control system for bearings manufacturing. This essentially involves a real-time task assignment process among parts, machines,and o...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1997
|
Online Access: | http://ndltd.ncl.edu.tw/handle/26795010725161499810 |
id |
ndltd-TW-085NCTU0031005 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-085NCTU00310052015-10-13T17:59:37Z http://ndltd.ncl.edu.tw/handle/26795010725161499810 Auction-based Shop Floor Control System Design for Bearings Industry 利用拍賣競價方式實作軸承製造的現場監控系統 Wu, Chun-Yung 吳春勇 碩士 國立交通大學 工業工程與管理學系 85 Auction-based heterarchical control architecture is proposed to design a shopfloor control system for bearings manufacturing. This essentially involves a real-time task assignment process among parts, machines,and operators through auction mechanism. In this thesis,auction theory is reviewed;a bidding information system has been designed;a real-time expert system is used for monitoringthe status on shop floor. Overall the heterarchical control approach reduces WIPs,increases machine utilization, and improves the system performance on the shop floor. Liang Gau-Rong 梁高榮 1997 學位論文 ; thesis 2 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立交通大學 === 工業工程與管理學系 === 85 === Auction-based heterarchical control architecture is proposed to
design a shopfloor control system for bearings manufacturing.
This essentially involves a real-time task assignment process
among parts, machines,and operators through auction mechanism.
In this thesis,auction theory is reviewed;a bidding information
system has been designed;a real-time expert system is used for
monitoringthe status on shop floor. Overall the heterarchical
control approach reduces WIPs,increases machine utilization, and
improves the system performance on the shop floor.
|
author2 |
Liang Gau-Rong |
author_facet |
Liang Gau-Rong Wu, Chun-Yung 吳春勇 |
author |
Wu, Chun-Yung 吳春勇 |
spellingShingle |
Wu, Chun-Yung 吳春勇 Auction-based Shop Floor Control System Design for Bearings Industry |
author_sort |
Wu, Chun-Yung |
title |
Auction-based Shop Floor Control System Design for Bearings Industry |
title_short |
Auction-based Shop Floor Control System Design for Bearings Industry |
title_full |
Auction-based Shop Floor Control System Design for Bearings Industry |
title_fullStr |
Auction-based Shop Floor Control System Design for Bearings Industry |
title_full_unstemmed |
Auction-based Shop Floor Control System Design for Bearings Industry |
title_sort |
auction-based shop floor control system design for bearings industry |
publishDate |
1997 |
url |
http://ndltd.ncl.edu.tw/handle/26795010725161499810 |
work_keys_str_mv |
AT wuchunyung auctionbasedshopfloorcontrolsystemdesignforbearingsindustry AT wúchūnyǒng auctionbasedshopfloorcontrolsystemdesignforbearingsindustry AT wuchunyung lìyòngpāimàijìngjiàfāngshìshízuòzhóuchéngzhìzàodexiànchǎngjiānkòngxìtǒng AT wúchūnyǒng lìyòngpāimàijìngjiàfāngshìshízuòzhóuchéngzhìzàodexiànchǎngjiānkòngxìtǒng |
_version_ |
1717785815349723136 |