THE DEVELOPMENT OF REACTIVE SCHEDULING ALGORITHM FOR THE JOB- SHOPTYPE FACTORY UNDER ABNORMAL SITUATION

碩士 === 元智工學院 === 工業工程學系 === 84 === This research is to investigate the most incurring problem , " the exchange ofthe manufacturing orders" , in the dynamic scheduling of the shop floor.As theresults , the causes and effects of these disturb...

Full description

Bibliographic Details
Main Authors: WU, BEN-YU, 吳斌友
Other Authors: Pei-chann Chang
Format: Others
Language:zh-TW
Online Access:http://ndltd.ncl.edu.tw/handle/28231818164393076534