THE DEVELOPMENT OF REACTIVE SCHEDULING ALGORITHM FOR THE JOB- SHOPTYPE FACTORY UNDER ABNORMAL SITUATION
碩士 === 元智工學院 === 工業工程學系 === 84 === This research is to investigate the most incurring problem , " the exchange ofthe manufacturing orders" , in the dynamic scheduling of the shop floor.As theresults , the causes and effects of these disturb...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Online Access: | http://ndltd.ncl.edu.tw/handle/28231818164393076534 |
id |
ndltd-TW-084YZU00030004 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-084YZU000300042016-02-03T04:32:09Z http://ndltd.ncl.edu.tw/handle/28231818164393076534 THE DEVELOPMENT OF REACTIVE SCHEDULING ALGORITHM FOR THE JOB- SHOPTYPE FACTORY UNDER ABNORMAL SITUATION 零工廠在異常環境下主動反應式排程法則之發展 WU, BEN-YU 吳斌友 碩士 元智工學院 工業工程學系 84 This research is to investigate the most incurring problem , " the exchange ofthe manufacturing orders" , in the dynamic scheduling of the shop floor.As theresults , the causes and effects of these disturbances can be furthercategorized and analyzed . Therefor , the impacts of each disturbances to theoriginal schedule can be clearly identified . Then , a reactive schedulingalgorithm is to be developed to efficiently and efficiently resolve theimpacts caused by the disturbances on the shop floor. As the solution to theimpacts of the disturbances , we can mimic the logic applied in MRP, i.e., netchange, and regenerate. The computation time in net change is small while thesolution quality is rough and near-sighted . As in regenerate , the solutiontime is cos tly while the solution quality is closed to optimality . Base onthe " net change " in MRP , we will develop a "Change-Order" method. When "theexchange of manufacturing orders " happens , it can analyze the disturbancesand generate a new feasible schedule rapidly . This result is better thenusing the " Fix-Order " method . Especially on the control for the delayingorders . Also , we will find a feasible solution to clinch " rush orders "problems which factories are often incurring. Pei-chann Chang 張百棧 學位論文 ; thesis 57 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 元智工學院 === 工業工程學系 === 84 === This research is to investigate the most incurring problem , "
the exchange ofthe manufacturing orders" , in the dynamic
scheduling of the shop floor.As theresults , the causes and
effects of these disturbances can be furthercategorized
and analyzed . Therefor , the impacts of each disturbances to
theoriginal schedule can be clearly identified . Then , a
reactive schedulingalgorithm is to be developed to
efficiently and efficiently resolve theimpacts caused by the
disturbances on the shop floor. As the solution to theimpacts of
the disturbances , we can mimic the logic applied in MRP, i.e.,
netchange, and regenerate. The computation time in net change
is small while thesolution quality is rough and near-sighted .
As in regenerate , the solutiontime is cos tly while the
solution quality is closed to optimality . Base onthe " net
change " in MRP , we will develop a "Change-Order" method. When
"theexchange of manufacturing orders " happens , it can
analyze the disturbancesand generate a new feasible schedule
rapidly . This result is better thenusing the " Fix-Order "
method . Especially on the control for the delayingorders .
Also , we will find a feasible solution to clinch " rush
orders "problems which factories are often incurring.
|
author2 |
Pei-chann Chang |
author_facet |
Pei-chann Chang WU, BEN-YU 吳斌友 |
author |
WU, BEN-YU 吳斌友 |
spellingShingle |
WU, BEN-YU 吳斌友 THE DEVELOPMENT OF REACTIVE SCHEDULING ALGORITHM FOR THE JOB- SHOPTYPE FACTORY UNDER ABNORMAL SITUATION |
author_sort |
WU, BEN-YU |
title |
THE DEVELOPMENT OF REACTIVE SCHEDULING ALGORITHM FOR THE JOB- SHOPTYPE FACTORY UNDER ABNORMAL SITUATION |
title_short |
THE DEVELOPMENT OF REACTIVE SCHEDULING ALGORITHM FOR THE JOB- SHOPTYPE FACTORY UNDER ABNORMAL SITUATION |
title_full |
THE DEVELOPMENT OF REACTIVE SCHEDULING ALGORITHM FOR THE JOB- SHOPTYPE FACTORY UNDER ABNORMAL SITUATION |
title_fullStr |
THE DEVELOPMENT OF REACTIVE SCHEDULING ALGORITHM FOR THE JOB- SHOPTYPE FACTORY UNDER ABNORMAL SITUATION |
title_full_unstemmed |
THE DEVELOPMENT OF REACTIVE SCHEDULING ALGORITHM FOR THE JOB- SHOPTYPE FACTORY UNDER ABNORMAL SITUATION |
title_sort |
development of reactive scheduling algorithm for the job- shoptype factory under abnormal situation |
url |
http://ndltd.ncl.edu.tw/handle/28231818164393076534 |
work_keys_str_mv |
AT wubenyu thedevelopmentofreactiveschedulingalgorithmforthejobshoptypefactoryunderabnormalsituation AT wúbīnyǒu thedevelopmentofreactiveschedulingalgorithmforthejobshoptypefactoryunderabnormalsituation AT wubenyu línggōngchǎngzàiyìchánghuánjìngxiàzhǔdòngfǎnyīngshìpáichéngfǎzézhīfāzhǎn AT wúbīnyǒu línggōngchǎngzàiyìchánghuánjìngxiàzhǔdòngfǎnyīngshìpáichéngfǎzézhīfāzhǎn AT wubenyu developmentofreactiveschedulingalgorithmforthejobshoptypefactoryunderabnormalsituation AT wúbīnyǒu developmentofreactiveschedulingalgorithmforthejobshoptypefactoryunderabnormalsituation |
_version_ |
1718177045361459200 |