The market survey and the introductory methodology development of the real time scheduling systems applied in the accuracy machinery industries

碩士 === 元智工學院 === 工業工程學系 === 84 === At present, the manufacturing industries in Taiwan confront a great change in the man power supply system and the infrastructure of the market environ- ment. Therefore, they must rely on the production technology i...

Full description

Bibliographic Details
Main Authors: Yang, Chyi-Wu, 楊奇武
Other Authors: Chang Pei-Chann
Format: Others
Language:zh-TW
Online Access:http://ndltd.ncl.edu.tw/handle/30387303100588528242
id ndltd-TW-084YZU00030003
record_format oai_dc
spelling ndltd-TW-084YZU000300032016-02-03T04:32:09Z http://ndltd.ncl.edu.tw/handle/30387303100588528242 The market survey and the introductory methodology development of the real time scheduling systems applied in the accuracy machinery industries 製造業現場排程系統在市場適用性之探討--以精密製造業為例 Yang, Chyi-Wu 楊奇武 碩士 元智工學院 工業工程學系 84 At present, the manufacturing industries in Taiwan confront a great change in the man power supply system and the infrastructure of the market environ- ment. Therefore, they must rely on the production technology improvement and the management skill progress to fully utilize the finite production resources. Most industries in Taiwan are small scale and the production type are repetitive and discrete, therefore they will face the scheduling problem during the production processes. If they can derive an effective scheduling tool to solve the problem, they can raise the production capacity , cut down the production costs, and stabilize the shipping process to meet the due date. This research consist of three different parts. The first is to collect related information through company investigation to identify the major characteristics of the factory and to realize the current scheduling problem faced by the factory. Therefore, a forecasting model for scheduling problem can be developed to evaluate the possibility that an effective scheduling system can be put into execution. The second is to develop a way of introducing the scheduling system which means the company can follow the predefined steps to establish their own scheduling information system. The third is to build up an evaluation model which can evaluate the current scheduling process of the factory. The model can suggest an improving direction for the scheduling system in the future. Based on this research, we can realize the application areas of the scheduling system for different type of industries. The company can follow the introducing methods developed by this research to build-up their own scheduling information system. Therefore, the company can fully extend their production capacity and raise their production efficiency through this scheduling information system. Chang Pei-Chann 張百棧 學位論文 ; thesis 90 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 元智工學院 === 工業工程學系 === 84 === At present, the manufacturing industries in Taiwan confront a great change in the man power supply system and the infrastructure of the market environ- ment. Therefore, they must rely on the production technology improvement and the management skill progress to fully utilize the finite production resources. Most industries in Taiwan are small scale and the production type are repetitive and discrete, therefore they will face the scheduling problem during the production processes. If they can derive an effective scheduling tool to solve the problem, they can raise the production capacity , cut down the production costs, and stabilize the shipping process to meet the due date. This research consist of three different parts. The first is to collect related information through company investigation to identify the major characteristics of the factory and to realize the current scheduling problem faced by the factory. Therefore, a forecasting model for scheduling problem can be developed to evaluate the possibility that an effective scheduling system can be put into execution. The second is to develop a way of introducing the scheduling system which means the company can follow the predefined steps to establish their own scheduling information system. The third is to build up an evaluation model which can evaluate the current scheduling process of the factory. The model can suggest an improving direction for the scheduling system in the future. Based on this research, we can realize the application areas of the scheduling system for different type of industries. The company can follow the introducing methods developed by this research to build-up their own scheduling information system. Therefore, the company can fully extend their production capacity and raise their production efficiency through this scheduling information system.
author2 Chang Pei-Chann
author_facet Chang Pei-Chann
Yang, Chyi-Wu
楊奇武
author Yang, Chyi-Wu
楊奇武
spellingShingle Yang, Chyi-Wu
楊奇武
The market survey and the introductory methodology development of the real time scheduling systems applied in the accuracy machinery industries
author_sort Yang, Chyi-Wu
title The market survey and the introductory methodology development of the real time scheduling systems applied in the accuracy machinery industries
title_short The market survey and the introductory methodology development of the real time scheduling systems applied in the accuracy machinery industries
title_full The market survey and the introductory methodology development of the real time scheduling systems applied in the accuracy machinery industries
title_fullStr The market survey and the introductory methodology development of the real time scheduling systems applied in the accuracy machinery industries
title_full_unstemmed The market survey and the introductory methodology development of the real time scheduling systems applied in the accuracy machinery industries
title_sort market survey and the introductory methodology development of the real time scheduling systems applied in the accuracy machinery industries
url http://ndltd.ncl.edu.tw/handle/30387303100588528242
work_keys_str_mv AT yangchyiwu themarketsurveyandtheintroductorymethodologydevelopmentoftherealtimeschedulingsystemsappliedintheaccuracymachineryindustries
AT yángqíwǔ themarketsurveyandtheintroductorymethodologydevelopmentoftherealtimeschedulingsystemsappliedintheaccuracymachineryindustries
AT yangchyiwu zhìzàoyèxiànchǎngpáichéngxìtǒngzàishìchǎngshìyòngxìngzhītàntǎoyǐjīngmìzhìzàoyèwèilì
AT yángqíwǔ zhìzàoyèxiànchǎngpáichéngxìtǒngzàishìchǎngshìyòngxìngzhītàntǎoyǐjīngmìzhìzàoyèwèilì
AT yangchyiwu marketsurveyandtheintroductorymethodologydevelopmentoftherealtimeschedulingsystemsappliedintheaccuracymachineryindustries
AT yángqíwǔ marketsurveyandtheintroductorymethodologydevelopmentoftherealtimeschedulingsystemsappliedintheaccuracymachineryindustries
_version_ 1718177044857094144