Study of the construction management for partial-precast-layered methods in high-rise building construction
碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 84 === The construction industry in Taiwan has grown prosperously in recent years due to the continuous economic achievements. In the same period, the construction contractors are facing the tougher investment environment,...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1996
|
Online Access: | http://ndltd.ncl.edu.tw/handle/12175834705586303564 |
id |
ndltd-TW-084NTUST512029 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-084NTUST5120292016-07-13T04:11:03Z http://ndltd.ncl.edu.tw/handle/12175834705586303564 Study of the construction management for partial-precast-layered methods in high-rise building construction 半預鑄積層工法之施工管理研究 GUO-JI TSAY 蔡國基 碩士 國立臺灣科技大學 營建工程技術學系 84 The construction industry in Taiwan has grown prosperously in recent years due to the continuous economic achievements. In the same period, the construction contractors are facing the tougher investment environment, high land cost, lack of technical workers, rising wages etc.. How to use new construction methods and technology to reduce construction cost, spend less time, enhance quality and improve construction safety has become one of the main issues of today''s construction industry. The high rise building Partial-Precast- Layered method provide an effective solution. Partial-Precast- Layered method is deemed to be one of the main stream of future construction methods. However, it has not yet been adopted in many sites, people are not familiar with its operation processes and management, which have seriously affected contractors'' willingness to adopt this construction method. Therefore, by using rational evaluation procedure of Parttial- Precast-Layered method and try to improve its works to the expected effectiveness. Also,this research conclude the problem of Partial-Precast-Layered method during its planing, manufacturing, and construction satges and try to find Accompanied with the standardization of working processes, this construction method could be effectively managed. Finally, this research discusses its problems resulted in the construction processes, such an analysis could provide reference to the contractors and improve the construction technology. GINN-FA SHEEN 沈進發 1996 學位論文 ; thesis 114 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 84 === The construction industry in Taiwan has grown prosperously in
recent years due to the continuous economic achievements. In
the same period, the construction contractors are facing the
tougher investment environment, high land cost, lack of
technical workers, rising wages etc.. How to use new
construction methods and technology to reduce construction
cost, spend less time, enhance quality and improve construction
safety has become one of the main issues of today''s
construction industry. The high rise building Partial-Precast-
Layered method provide an effective solution. Partial-Precast-
Layered method is deemed to be one of the main stream of future
construction methods. However, it has not yet been adopted in
many sites, people are not familiar with its operation
processes and management, which have seriously affected
contractors'' willingness to adopt this construction method.
Therefore, by using rational evaluation procedure of Parttial-
Precast-Layered method and try to improve its works to the
expected effectiveness. Also,this research conclude the problem
of Partial-Precast-Layered method during its planing,
manufacturing, and construction satges and try to find
Accompanied with the standardization of working processes, this
construction method could be effectively managed. Finally, this
research discusses its problems resulted in the construction
processes, such an analysis could provide reference to the
contractors and improve the construction technology.
|
author2 |
GINN-FA SHEEN |
author_facet |
GINN-FA SHEEN GUO-JI TSAY 蔡國基 |
author |
GUO-JI TSAY 蔡國基 |
spellingShingle |
GUO-JI TSAY 蔡國基 Study of the construction management for partial-precast-layered methods in high-rise building construction |
author_sort |
GUO-JI TSAY |
title |
Study of the construction management for partial-precast-layered methods in high-rise building construction |
title_short |
Study of the construction management for partial-precast-layered methods in high-rise building construction |
title_full |
Study of the construction management for partial-precast-layered methods in high-rise building construction |
title_fullStr |
Study of the construction management for partial-precast-layered methods in high-rise building construction |
title_full_unstemmed |
Study of the construction management for partial-precast-layered methods in high-rise building construction |
title_sort |
study of the construction management for partial-precast-layered methods in high-rise building construction |
publishDate |
1996 |
url |
http://ndltd.ncl.edu.tw/handle/12175834705586303564 |
work_keys_str_mv |
AT guojitsay studyoftheconstructionmanagementforpartialprecastlayeredmethodsinhighrisebuildingconstruction AT càiguójī studyoftheconstructionmanagementforpartialprecastlayeredmethodsinhighrisebuildingconstruction AT guojitsay bànyùzhùjīcénggōngfǎzhīshīgōngguǎnlǐyánjiū AT càiguójī bànyùzhùjīcénggōngfǎzhīshīgōngguǎnlǐyánjiū |
_version_ |
1718347573036580864 |