The derivation and evaluation of operating rule for Shihmen reservoir

碩士 === 國立臺灣大學 === 農業工程學系 === 84 === The yield of a reservoir is greatly affected by the operating rule used.An improper operating rule may cause waste of water resource and lead to a water supply shortage at downstream area. To derive an efficient operati...

Full description

Bibliographic Details
Main Authors: Hsu,Jong-Pao, 徐忠寶
Other Authors: Su,Ming-Daw
Format: Others
Language:zh-TW
Published: 1996
Online Access:http://ndltd.ncl.edu.tw/handle/74795024798436737330
id ndltd-TW-084NTU00404026
record_format oai_dc
spelling ndltd-TW-084NTU004040262016-07-13T04:10:50Z http://ndltd.ncl.edu.tw/handle/74795024798436737330 The derivation and evaluation of operating rule for Shihmen reservoir 石門水庫操作規則之推導及評估 Hsu,Jong-Pao 徐忠寶 碩士 國立臺灣大學 農業工程學系 84 The yield of a reservoir is greatly affected by the operating rule used.An improper operating rule may cause waste of water resource and lead to a water supply shortage at downstream area. To derive an efficient operating rule becomes an important issue. Most of the reservoirs in Taiwan are operated according to a set of ruling curves.This method of ruling curves is simple but rigid .It is not flexible to response to the change of input and output of the water system such as incoming stream flow or the down- stream water demand.Some studies have been done for major reser- voirs to modify the current ruling curves for better yield.But the characteristics of rigidness is still hanging there.The objective of this study is derive new operating rules for better operation of the reservoir. An optimization model was built for the target reservoir.The historical records of inflow and release were input and optimum operation for each year were obtained.The optimal operations was then related to selected predicting variable through statistical analysis and operating rules derived.These rules were then fed into a simulation model for evaluations.Stochastic dominance was used to evaluated the derived rules and current ruling curve.The results reveal that derived rule of this study is better than the current and previous proposed modified ruling curves in terms of frequency and scale of shortage. Su,Ming-Daw 蘇明道 1996 學位論文 ; thesis 100 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 農業工程學系 === 84 === The yield of a reservoir is greatly affected by the operating rule used.An improper operating rule may cause waste of water resource and lead to a water supply shortage at downstream area. To derive an efficient operating rule becomes an important issue. Most of the reservoirs in Taiwan are operated according to a set of ruling curves.This method of ruling curves is simple but rigid .It is not flexible to response to the change of input and output of the water system such as incoming stream flow or the down- stream water demand.Some studies have been done for major reser- voirs to modify the current ruling curves for better yield.But the characteristics of rigidness is still hanging there.The objective of this study is derive new operating rules for better operation of the reservoir. An optimization model was built for the target reservoir.The historical records of inflow and release were input and optimum operation for each year were obtained.The optimal operations was then related to selected predicting variable through statistical analysis and operating rules derived.These rules were then fed into a simulation model for evaluations.Stochastic dominance was used to evaluated the derived rules and current ruling curve.The results reveal that derived rule of this study is better than the current and previous proposed modified ruling curves in terms of frequency and scale of shortage.
author2 Su,Ming-Daw
author_facet Su,Ming-Daw
Hsu,Jong-Pao
徐忠寶
author Hsu,Jong-Pao
徐忠寶
spellingShingle Hsu,Jong-Pao
徐忠寶
The derivation and evaluation of operating rule for Shihmen reservoir
author_sort Hsu,Jong-Pao
title The derivation and evaluation of operating rule for Shihmen reservoir
title_short The derivation and evaluation of operating rule for Shihmen reservoir
title_full The derivation and evaluation of operating rule for Shihmen reservoir
title_fullStr The derivation and evaluation of operating rule for Shihmen reservoir
title_full_unstemmed The derivation and evaluation of operating rule for Shihmen reservoir
title_sort derivation and evaluation of operating rule for shihmen reservoir
publishDate 1996
url http://ndltd.ncl.edu.tw/handle/74795024798436737330
work_keys_str_mv AT hsujongpao thederivationandevaluationofoperatingruleforshihmenreservoir
AT xúzhōngbǎo thederivationandevaluationofoperatingruleforshihmenreservoir
AT hsujongpao shíménshuǐkùcāozuòguīzézhītuīdǎojípínggū
AT xúzhōngbǎo shíménshuǐkùcāozuòguīzézhītuīdǎojípínggū
AT hsujongpao derivationandevaluationofoperatingruleforshihmenreservoir
AT xúzhōngbǎo derivationandevaluationofoperatingruleforshihmenreservoir
_version_ 1718346110045519872