Effectiveness of Initial Operation Storage to Flood Augumentation of Reservoir Flood Control

碩士 === 國立成功大學 === 水利及海洋工程學系 === 84 === To reduce the occurrence of disastrous floods. With permission of economy, People have built hydraulic constuuctions such as the reservoirs. They look forward to be aware of the magnitude and prob...

Full description

Bibliographic Details
Main Authors: Yang, Sen-Bih, 楊森弼
Other Authors: Frederic N.-F. Chou, Din Shrin-Chen
Format: Others
Language:zh-TW
Published: 1996
Online Access:http://ndltd.ncl.edu.tw/handle/34639631551140110201
id ndltd-TW-084NCKU0083020
record_format oai_dc
spelling ndltd-TW-084NCKU00830202016-02-05T04:16:26Z http://ndltd.ncl.edu.tw/handle/34639631551140110201 Effectiveness of Initial Operation Storage to Flood Augumentation of Reservoir Flood Control 防洪運轉起始水位對水庫調洪之影響 Yang, Sen-Bih 楊森弼 碩士 國立成功大學 水利及海洋工程學系 84 To reduce the occurrence of disastrous floods. With permission of economy, People have built hydraulic constuuctions such as the reservoirs. They look forward to be aware of the magnitude and probability of downstream flood dis- charge after the reservoir opreation, in order to be the necessity measure for the flood control. The evolution of river channel section and the scouring and deposition of flood plain are mainly the effects of flood discharge, and the process and magnitude of flood dischargeaffect the stability design of river channel.Therefore, as far as flood discharge is concerned, it's essential to consider the influence of the reservoir operation to flood augumentation. So the peak flow and probability distribution of discharge in certain locations over the river basin would be the reference for design of section size of river channel and utilization of plain along the river. The outflow discharge of the reservoir is related with the reservoir storage.In the condition of lacking historical flood control records,This study suggestsan analytical method to probe into the effectiveness of initial operation storageto flood augumentation of reservoir flood control and takes the flood control ope-ration of Tsengwen reservoir as an example. It is concluded that probability of the maximum flood discharge of the spiiway is quite small and probable maximum flood (pmf) would be overestimated. May be it can be made a correction to reduce the unnece- ssary operation of the spillway and to make the best use of the reservoir storage. Frederic N.-F. Chou, Din Shrin-Chen 周乃昉, 丁舜臣 1996 學位論文 ; thesis 63 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 水利及海洋工程學系 === 84 === To reduce the occurrence of disastrous floods. With permission of economy, People have built hydraulic constuuctions such as the reservoirs. They look forward to be aware of the magnitude and probability of downstream flood dis- charge after the reservoir opreation, in order to be the necessity measure for the flood control. The evolution of river channel section and the scouring and deposition of flood plain are mainly the effects of flood discharge, and the process and magnitude of flood dischargeaffect the stability design of river channel.Therefore, as far as flood discharge is concerned, it's essential to consider the influence of the reservoir operation to flood augumentation. So the peak flow and probability distribution of discharge in certain locations over the river basin would be the reference for design of section size of river channel and utilization of plain along the river. The outflow discharge of the reservoir is related with the reservoir storage.In the condition of lacking historical flood control records,This study suggestsan analytical method to probe into the effectiveness of initial operation storageto flood augumentation of reservoir flood control and takes the flood control ope-ration of Tsengwen reservoir as an example. It is concluded that probability of the maximum flood discharge of the spiiway is quite small and probable maximum flood (pmf) would be overestimated. May be it can be made a correction to reduce the unnece- ssary operation of the spillway and to make the best use of the reservoir storage.
author2 Frederic N.-F. Chou, Din Shrin-Chen
author_facet Frederic N.-F. Chou, Din Shrin-Chen
Yang, Sen-Bih
楊森弼
author Yang, Sen-Bih
楊森弼
spellingShingle Yang, Sen-Bih
楊森弼
Effectiveness of Initial Operation Storage to Flood Augumentation of Reservoir Flood Control
author_sort Yang, Sen-Bih
title Effectiveness of Initial Operation Storage to Flood Augumentation of Reservoir Flood Control
title_short Effectiveness of Initial Operation Storage to Flood Augumentation of Reservoir Flood Control
title_full Effectiveness of Initial Operation Storage to Flood Augumentation of Reservoir Flood Control
title_fullStr Effectiveness of Initial Operation Storage to Flood Augumentation of Reservoir Flood Control
title_full_unstemmed Effectiveness of Initial Operation Storage to Flood Augumentation of Reservoir Flood Control
title_sort effectiveness of initial operation storage to flood augumentation of reservoir flood control
publishDate 1996
url http://ndltd.ncl.edu.tw/handle/34639631551140110201
work_keys_str_mv AT yangsenbih effectivenessofinitialoperationstoragetofloodaugumentationofreservoirfloodcontrol
AT yángsēnbì effectivenessofinitialoperationstoragetofloodaugumentationofreservoirfloodcontrol
AT yangsenbih fánghóngyùnzhuǎnqǐshǐshuǐwèiduìshuǐkùdiàohóngzhīyǐngxiǎng
AT yángsēnbì fánghóngyùnzhuǎnqǐshǐshuǐwèiduìshuǐkùdiàohóngzhīyǐngxiǎng
_version_ 1718180024693030912