A Study of Scheduling Problems in Plastic Tile Production with Multiple Resource Constrains
碩士 === 中原大學 === 工業工程研究所 === 84 ===
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1996
|
Online Access: | http://ndltd.ncl.edu.tw/handle/46232427756112227750 |
id |
ndltd-TW-084CYCU0030003 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-084CYCU00300032016-07-15T04:13:06Z http://ndltd.ncl.edu.tw/handle/46232427756112227750 A Study of Scheduling Problems in Plastic Tile Production with Multiple Resource Constrains 具多種資源限制之塑膠地磚生產排程問題之研究 Liao ,Yun-Fu 廖元甫 碩士 中原大學 工業工程研究所 84 Chen, Chien Liang 陳建良 1996 學位論文 ; thesis 0 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 中原大學 === 工業工程研究所 === 84 ===
|
author2 |
Chen, Chien Liang |
author_facet |
Chen, Chien Liang Liao ,Yun-Fu 廖元甫 |
author |
Liao ,Yun-Fu 廖元甫 |
spellingShingle |
Liao ,Yun-Fu 廖元甫 A Study of Scheduling Problems in Plastic Tile Production with Multiple Resource Constrains |
author_sort |
Liao ,Yun-Fu |
title |
A Study of Scheduling Problems in Plastic Tile Production with Multiple Resource Constrains |
title_short |
A Study of Scheduling Problems in Plastic Tile Production with Multiple Resource Constrains |
title_full |
A Study of Scheduling Problems in Plastic Tile Production with Multiple Resource Constrains |
title_fullStr |
A Study of Scheduling Problems in Plastic Tile Production with Multiple Resource Constrains |
title_full_unstemmed |
A Study of Scheduling Problems in Plastic Tile Production with Multiple Resource Constrains |
title_sort |
study of scheduling problems in plastic tile production with multiple resource constrains |
publishDate |
1996 |
url |
http://ndltd.ncl.edu.tw/handle/46232427756112227750 |
work_keys_str_mv |
AT liaoyunfu astudyofschedulingproblemsinplastictileproductionwithmultipleresourceconstrains AT liàoyuánfǔ astudyofschedulingproblemsinplastictileproductionwithmultipleresourceconstrains AT liaoyunfu jùduōzhǒngzīyuánxiànzhìzhīsùjiāodezhuānshēngchǎnpáichéngwèntízhīyánjiū AT liàoyuánfǔ jùduōzhǒngzīyuánxiànzhìzhīsùjiāodezhuānshēngchǎnpáichéngwèntízhīyánjiū AT liaoyunfu studyofschedulingproblemsinplastictileproductionwithmultipleresourceconstrains AT liàoyuánfǔ studyofschedulingproblemsinplastictileproductionwithmultipleresourceconstrains |
_version_ |
1718349688241913856 |