Evaluating the impact of machine breakdown on the simulation performance of job shop pre-scheduling
碩士 === 中華大學 === 工業研究所 === 84 ===
Main Authors: | Chiu, Ko Ching, 邱科璟 |
---|---|
Other Authors: | Deng, Wei Jaw |
Format: | Others |
Language: | zh-TW |
Published: |
1996
|
Online Access: | http://ndltd.ncl.edu.tw/handle/10135305340569963523 |
Similar Items
-
An approach of No Wait Job Shop Scheduling with Identical Parallel Machine and Setup time
by: Ko-Han Chen, et al.
Published: (2009) -
Machine and operator scheduling of a job shop
by: Qiu, Tai Long, et al.
Published: (1994) -
Job Shop Scheduling with Machine Availability Constraint and Recirculation Jobs
by: Wei-ting Huang, et al.
Published: (2011) -
Simulation of job shop scheduling for missed due date performance
by: Jiang, Jian
Published: (2014) -
Job-shop scheduling
by: Sondhu, Balraj Singh.
Published: (2015)