A Stepwise Evaluation Model For Introduction of Flexible Manufacturing System
碩士 === 國防管理學院 === 資源管理研究所 === 82 === Due to the complexity and large investment of a flexible manufacturing systme, it may cause big influence on the operation and production style of a manufacturing company, and hence it is necessary to evaluate the introduction of a flexible manufacturing syste...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1994
|
Online Access: | http://ndltd.ncl.edu.tw/handle/80002777418026880451 |
id |
ndltd-TW-082NDMC3399010 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-082NDMC33990102016-07-18T04:09:44Z http://ndltd.ncl.edu.tw/handle/80002777418026880451 A Stepwise Evaluation Model For Introduction of Flexible Manufacturing System 引進彈性製造系統之階段式評估模式 林清澄 碩士 國防管理學院 資源管理研究所 82 Due to the complexity and large investment of a flexible manufacturing systme, it may cause big influence on the operation and production style of a manufacturing company, and hence it is necessary to evaluate the introduction of a flexible manufacturing system very carefully. In this paper, we review the existing models in the literature and suggest a stepwise model in proceeding the evaluation: at first, to analyze the suitability of the introdaction of FMS strategically, then screen the proposals presented by the suppliers for a specific type of FMS requested by the company, at last, to evaluate some of the main performance characteristics, suchas flexibility and-quality, and the related costs in more detail and obtain the optimal proposal. the techniques of relationship matrix, analytic hierarchy process(AHP) and the technique for order preference samlarity to ideal solution(TOPSIS) are suggested for the three steps of evaluation respectively. Delphi method is also suggested for gathering the knowledge and experienoe a experts. 李嘉聖 1994 學位論文 ; thesis 98 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國防管理學院 === 資源管理研究所 === 82 ===
Due to the complexity and large investment of a flexible manufacturing systme, it may cause big influence on the operation and production style of a manufacturing company, and hence it is necessary to evaluate the introduction of a flexible manufacturing system very carefully. In this paper, we review the existing models in the literature and suggest a stepwise model in proceeding the evaluation: at first, to analyze the suitability of the introdaction of FMS strategically, then screen the proposals presented by the suppliers for a specific type of FMS requested by the company, at last, to evaluate some of the main performance characteristics, suchas flexibility and-quality, and the related costs in more detail and obtain the optimal proposal. the techniques of relationship matrix, analytic hierarchy process(AHP) and the technique for order preference samlarity to ideal solution(TOPSIS) are suggested for the three steps of evaluation respectively. Delphi method is also suggested for gathering the knowledge and experienoe a experts.
|
author2 |
李嘉聖 |
author_facet |
李嘉聖 林清澄 |
author |
林清澄 |
spellingShingle |
林清澄 A Stepwise Evaluation Model For Introduction of Flexible Manufacturing System |
author_sort |
林清澄 |
title |
A Stepwise Evaluation Model For Introduction of Flexible Manufacturing System |
title_short |
A Stepwise Evaluation Model For Introduction of Flexible Manufacturing System |
title_full |
A Stepwise Evaluation Model For Introduction of Flexible Manufacturing System |
title_fullStr |
A Stepwise Evaluation Model For Introduction of Flexible Manufacturing System |
title_full_unstemmed |
A Stepwise Evaluation Model For Introduction of Flexible Manufacturing System |
title_sort |
stepwise evaluation model for introduction of flexible manufacturing system |
publishDate |
1994 |
url |
http://ndltd.ncl.edu.tw/handle/80002777418026880451 |
work_keys_str_mv |
AT línqīngchéng astepwiseevaluationmodelforintroductionofflexiblemanufacturingsystem AT línqīngchéng yǐnjìndànxìngzhìzàoxìtǒngzhījiēduànshìpínggūmóshì AT línqīngchéng stepwiseevaluationmodelforintroductionofflexiblemanufacturingsystem |
_version_ |
1718352356327817216 |