Study on a suitable Operational Range ofMicro-landscape Management of Chinese Fir Plantation

碩士 === 國立中興大學 === 森林學系 === 82 === The purposes of this study are to discuss what forest micro- landscape management needed for recreation, to find out the oper- ations of the planted forest management for getting a beautifull and scape, and...

Full description

Bibliographic Details
Main Authors: Chung-yu Lin, 林重佑
Other Authors: Yung-Kuen Fang、Un-Ching Lin 
Format: Others
Language:zh-TW
Published: 1994
Online Access:http://ndltd.ncl.edu.tw/handle/74658694825684269285
Description
Summary:碩士 === 國立中興大學 === 森林學系 === 82 === The purposes of this study are to discuss what forest micro- landscape management needed for recreation, to find out the oper- ations of the planted forest management for getting a beautifull and scape, and to set the optimum depth of forest micro-landscape management by available and economic analysis. Three sample plots of Chiness Fir plantation in Hue-Sun were selected. The weedingand prunning of the silviculture were the micro-landscape manage-ment method. After micro-landscape manage- ment,in cooperating thefeeling of viewers, the transparent dista- nceand the weeding andprunning by steps were made an investigati- on to the sense of visual beauty of every steps. The results obtained are as follows: 1.Weeding operation only or weeding and prunning operations can create wide,right, open, safe, and pleasant foreground and micro- landscape. 2.Weeding operation only or weeding and prunning operations can enhance the forest transparency and make the foreground and micro-landscape better,so they are essential to forest micro- landscape management. 3.The depth of forest micro- landscape management is around 12∼ 16m,which presents the most beautiful feature. So it is also the suitable oprational range of micro-landscerpe management. If the issues of cost and conservation are considered, 12m will be enou- gh. 4.The depth of forest micro-landscape management is depended upon land form factors. Usually the higher the slope, the shorter the depth should be applied.