Study of optimum opteration strategy for cogeneration system under time-of-use rates
碩士 === 大同工學院 === 電機工程研究所 === 81 === Economic dispatch for cogeneration system is to get the optimal operation strategy and minimize the overall operation cost subject to satisfying the demand of process steam and electrical load. This thesi...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
1993
|
Online Access: | http://ndltd.ncl.edu.tw/handle/18716286404650599836 |
id |
ndltd-TW-081TTIT0442016 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-081TTIT04420162016-02-10T04:08:52Z http://ndltd.ncl.edu.tw/handle/18716286404650599836 Study of optimum opteration strategy for cogeneration system under time-of-use rates 考慮時間電價之汽電共生廠最佳化運轉策略之研究 Cheng-Chuang Hong 洪振川 碩士 大同工學院 電機工程研究所 81 Economic dispatch for cogeneration system is to get the optimal operation strategy and minimize the overall operation cost subject to satisfying the demand of process steam and electrical load. This thesis proposes an optimal method based on Newton-Rapson method for economic dispatch. The cogeneration system can be divided into two parts : one is the steam system, and the other is the electric system. The steam system is to perform economic dispatch for boilers and minimize the overall cost of all fuels subject to satisfying the demand of high- pressure steam. The electric system is to minimize the electric cost after considering time-of-use rates and various constraints that applied on real system subject to satisfying the demand of process steam in first priority and electric load. A real cogeneration system is cited as an example to verify the availability of the proposed method. Bin-Kwie Chen 陳斌魁 1993 學位論文 ; thesis 109 en_US |
collection |
NDLTD |
language |
en_US |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 大同工學院 === 電機工程研究所 === 81 === Economic dispatch for cogeneration system is to get the optimal
operation strategy and minimize the overall operation cost
subject to satisfying the demand of process steam and
electrical load. This thesis proposes an optimal method based
on Newton-Rapson method for economic dispatch. The cogeneration
system can be divided into two parts : one is the steam system,
and the other is the electric system. The steam system is to
perform economic dispatch for boilers and minimize the overall
cost of all fuels subject to satisfying the demand of high-
pressure steam. The electric system is to minimize the electric
cost after considering time-of-use rates and various
constraints that applied on real system subject to satisfying
the demand of process steam in first priority and electric
load. A real cogeneration system is cited as an example to
verify the availability of the proposed method.
|
author2 |
Bin-Kwie Chen |
author_facet |
Bin-Kwie Chen Cheng-Chuang Hong 洪振川 |
author |
Cheng-Chuang Hong 洪振川 |
spellingShingle |
Cheng-Chuang Hong 洪振川 Study of optimum opteration strategy for cogeneration system under time-of-use rates |
author_sort |
Cheng-Chuang Hong |
title |
Study of optimum opteration strategy for cogeneration system under time-of-use rates |
title_short |
Study of optimum opteration strategy for cogeneration system under time-of-use rates |
title_full |
Study of optimum opteration strategy for cogeneration system under time-of-use rates |
title_fullStr |
Study of optimum opteration strategy for cogeneration system under time-of-use rates |
title_full_unstemmed |
Study of optimum opteration strategy for cogeneration system under time-of-use rates |
title_sort |
study of optimum opteration strategy for cogeneration system under time-of-use rates |
publishDate |
1993 |
url |
http://ndltd.ncl.edu.tw/handle/18716286404650599836 |
work_keys_str_mv |
AT chengchuanghong studyofoptimumopterationstrategyforcogenerationsystemundertimeofuserates AT hóngzhènchuān studyofoptimumopterationstrategyforcogenerationsystemundertimeofuserates AT chengchuanghong kǎolǜshíjiāndiànjiàzhīqìdiàngòngshēngchǎngzuìjiāhuàyùnzhuǎncèlüèzhīyánjiū AT hóngzhènchuān kǎolǜshíjiāndiànjiàzhīqìdiàngòngshēngchǎngzuìjiāhuàyùnzhuǎncèlüèzhīyánjiū |
_version_ |
1718184865519632384 |