The Study on the Construction Technique and Excavation Process Using D&B Method for Rock Tunnel in Northern Secondary Freeway
碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 81 ===
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1993
|
Online Access: | http://ndltd.ncl.edu.tw/handle/76894689989187702499 |
id |
ndltd-TW-081NTUST512044 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-081NTUST5120442016-02-10T04:08:46Z http://ndltd.ncl.edu.tw/handle/76894689989187702499 The Study on the Construction Technique and Excavation Process Using D&B Method for Rock Tunnel in Northern Secondary Freeway 北二高岩石隧道工程鑽炸施工法之施工技術與開挖進度探討 Shaw-Yih Ju 朱紹義 碩士 國立臺灣科技大學 營建工程技術學系 81 Wen-Lon Cheng 鄭文隆 1993 學位論文 ; thesis 0 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 81 ===
|
author2 |
Wen-Lon Cheng |
author_facet |
Wen-Lon Cheng Shaw-Yih Ju 朱紹義 |
author |
Shaw-Yih Ju 朱紹義 |
spellingShingle |
Shaw-Yih Ju 朱紹義 The Study on the Construction Technique and Excavation Process Using D&B Method for Rock Tunnel in Northern Secondary Freeway |
author_sort |
Shaw-Yih Ju |
title |
The Study on the Construction Technique and Excavation Process Using D&B Method for Rock Tunnel in Northern Secondary Freeway |
title_short |
The Study on the Construction Technique and Excavation Process Using D&B Method for Rock Tunnel in Northern Secondary Freeway |
title_full |
The Study on the Construction Technique and Excavation Process Using D&B Method for Rock Tunnel in Northern Secondary Freeway |
title_fullStr |
The Study on the Construction Technique and Excavation Process Using D&B Method for Rock Tunnel in Northern Secondary Freeway |
title_full_unstemmed |
The Study on the Construction Technique and Excavation Process Using D&B Method for Rock Tunnel in Northern Secondary Freeway |
title_sort |
study on the construction technique and excavation process using d&b method for rock tunnel in northern secondary freeway |
publishDate |
1993 |
url |
http://ndltd.ncl.edu.tw/handle/76894689989187702499 |
work_keys_str_mv |
AT shawyihju thestudyontheconstructiontechniqueandexcavationprocessusingdbmethodforrocktunnelinnorthernsecondaryfreeway AT zhūshàoyì thestudyontheconstructiontechniqueandexcavationprocessusingdbmethodforrocktunnelinnorthernsecondaryfreeway AT shawyihju běièrgāoyánshísuìdàogōngchéngzuānzhàshīgōngfǎzhīshīgōngjìshùyǔkāiwājìndùtàntǎo AT zhūshàoyì běièrgāoyánshísuìdàogōngchéngzuānzhàshīgōngfǎzhīshīgōngjìshùyǔkāiwājìndùtàntǎo AT shawyihju studyontheconstructiontechniqueandexcavationprocessusingdbmethodforrocktunnelinnorthernsecondaryfreeway AT zhūshàoyì studyontheconstructiontechniqueandexcavationprocessusingdbmethodforrocktunnelinnorthernsecondaryfreeway |
_version_ |
1718184251429486592 |