A STUDY OF RISK MANAGEMENT FOR TUNNELING METHOD IN ROCK TUNNELS
碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 81 === Risk management techniques are applied to assist constrc- tion management in identifying and analyzing uncertaninties and their impacts encounted in selecting construction method for Pin-Lin tunneling project of...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1993
|
Online Access: | http://ndltd.ncl.edu.tw/handle/15986596780321917663 |
id |
ndltd-TW-081NTUST512033 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-081NTUST5120332016-02-10T04:08:46Z http://ndltd.ncl.edu.tw/handle/15986596780321917663 A STUDY OF RISK MANAGEMENT FOR TUNNELING METHOD IN ROCK TUNNELS 岩石隧道開挖工法風險分析之研究 Yang Chih-Neng 楊智能 碩士 國立臺灣科技大學 營建工程技術學系 81 Risk management techniques are applied to assist constrc- tion management in identifying and analyzing uncertaninties and their impacts encounted in selecting construction method for Pin-Lin tunneling project of Taipei-Ilan Highway. Two major tunneling method including drill & blast (D&B) as well as tunnel boring machine (TBM) are evaluated. Analytical results show that the cost per unit length for TBM is much higher than D&B method. However, the total costrction time required for D&B mehtod is much longer than TBM method unless multiple work faces could. Both mehtods are very sensitive to uncertain geological condtions . Peng Yeng-Horng 彭雲宏 1993 學位論文 ; thesis 111 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 81 === Risk management techniques are applied to assist constrc- tion
management in identifying and analyzing uncertaninties and
their impacts encounted in selecting construction method for
Pin-Lin tunneling project of Taipei-Ilan Highway. Two major
tunneling method including drill & blast (D&B) as well as
tunnel boring machine (TBM) are evaluated. Analytical results
show that the cost per unit length for TBM is much higher than
D&B method. However, the total costrction time required for D&B
mehtod is much longer than TBM method unless multiple work
faces could. Both mehtods are very sensitive to uncertain
geological condtions .
|
author2 |
Peng Yeng-Horng |
author_facet |
Peng Yeng-Horng Yang Chih-Neng 楊智能 |
author |
Yang Chih-Neng 楊智能 |
spellingShingle |
Yang Chih-Neng 楊智能 A STUDY OF RISK MANAGEMENT FOR TUNNELING METHOD IN ROCK TUNNELS |
author_sort |
Yang Chih-Neng |
title |
A STUDY OF RISK MANAGEMENT FOR TUNNELING METHOD IN ROCK TUNNELS |
title_short |
A STUDY OF RISK MANAGEMENT FOR TUNNELING METHOD IN ROCK TUNNELS |
title_full |
A STUDY OF RISK MANAGEMENT FOR TUNNELING METHOD IN ROCK TUNNELS |
title_fullStr |
A STUDY OF RISK MANAGEMENT FOR TUNNELING METHOD IN ROCK TUNNELS |
title_full_unstemmed |
A STUDY OF RISK MANAGEMENT FOR TUNNELING METHOD IN ROCK TUNNELS |
title_sort |
study of risk management for tunneling method in rock tunnels |
publishDate |
1993 |
url |
http://ndltd.ncl.edu.tw/handle/15986596780321917663 |
work_keys_str_mv |
AT yangchihneng astudyofriskmanagementfortunnelingmethodinrocktunnels AT yángzhìnéng astudyofriskmanagementfortunnelingmethodinrocktunnels AT yangchihneng yánshísuìdàokāiwāgōngfǎfēngxiǎnfēnxīzhīyánjiū AT yángzhìnéng yánshísuìdàokāiwāgōngfǎfēngxiǎnfēnxīzhīyánjiū AT yangchihneng studyofriskmanagementfortunnelingmethodinrocktunnels AT yángzhìnéng studyofriskmanagementfortunnelingmethodinrocktunnels |
_version_ |
1718184246039805952 |