A STUDY OF RISK MANAGEMENT FOR TUNNELING METHOD IN ROCK TUNNELS

碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 81 === Risk management techniques are applied to assist constrc- tion management in identifying and analyzing uncertaninties and their impacts encounted in selecting construction method for Pin-Lin tunneling project of...

Full description

Bibliographic Details
Main Authors: Yang Chih-Neng, 楊智能
Other Authors: Peng Yeng-Horng
Format: Others
Language:zh-TW
Published: 1993
Online Access:http://ndltd.ncl.edu.tw/handle/15986596780321917663
Description
Summary:碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 81 === Risk management techniques are applied to assist constrc- tion management in identifying and analyzing uncertaninties and their impacts encounted in selecting construction method for Pin-Lin tunneling project of Taipei-Ilan Highway. Two major tunneling method including drill & blast (D&B) as well as tunnel boring machine (TBM) are evaluated. Analytical results show that the cost per unit length for TBM is much higher than D&B method. However, the total costrction time required for D&B mehtod is much longer than TBM method unless multiple work faces could. Both mehtods are very sensitive to uncertain geological condtions .