A Crew Scheduling System based on Constraint Logic Programming

碩士 === 國立臺灣大學 === 資訊工程研究所 === 81 === For most of the scheduling problems, they belong to the NP- problem. For example, crew scheduling, cabin crew scheduling and bus drivers assignment are all the scheduling problems. They are rather complicated and no s...

Full description

Bibliographic Details
Main Authors: Hu,Chih-Ching, 胡志青
Other Authors: Hsu,Ching-Chi
Format: Others
Language:zh-TW
Published: 1993
Online Access:http://ndltd.ncl.edu.tw/handle/54350381689637390075
id ndltd-TW-081NTU00392012
record_format oai_dc
spelling ndltd-TW-081NTU003920122016-02-10T04:09:01Z http://ndltd.ncl.edu.tw/handle/54350381689637390075 A Crew Scheduling System based on Constraint Logic Programming 建構於限制式邏輯程式設計方法之人員排班系統 Hu,Chih-Ching 胡志青 碩士 國立臺灣大學 資訊工程研究所 81 For most of the scheduling problems, they belong to the NP- problem. For example, crew scheduling, cabin crew scheduling and bus drivers assignment are all the scheduling problems. They are rather complicated and no simple algorithm can solve them efficiently. Even for a specific problem, it is still too difficult to find a good solution. Several researches have been studied, like Operation Research, Artificial Intelligence, Control Theory, etc. We will focus on the cabin crew scheduling problem. For a real life problem, it will have many constraint including hard constraint and soft constraint. The hard constraint must be obeyed and can not be violated and the soft constraint need to be obeyed as possible as we can. The problem still has a lot of requirements which need to be reached under the constraint. Moreover, the problem will have a lot of data which need to be accessed because it is a real life problem. So a data base management system is needed. In this thesis, we will point out the key points of cabin crew scheduling problem. We will discuss how to select a suitable constraint expression for the constraint and how to do the assignment operation, and we will propose the abstraction architecture for our implementation of cabin crew scheduling problem. We will just discuss the concept and the abstraction of the problem. We will not describe the detail about how to implement them. Hsu,Ching-Chi 許清琦 1993 學位論文 ; thesis 16 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 資訊工程研究所 === 81 === For most of the scheduling problems, they belong to the NP- problem. For example, crew scheduling, cabin crew scheduling and bus drivers assignment are all the scheduling problems. They are rather complicated and no simple algorithm can solve them efficiently. Even for a specific problem, it is still too difficult to find a good solution. Several researches have been studied, like Operation Research, Artificial Intelligence, Control Theory, etc. We will focus on the cabin crew scheduling problem. For a real life problem, it will have many constraint including hard constraint and soft constraint. The hard constraint must be obeyed and can not be violated and the soft constraint need to be obeyed as possible as we can. The problem still has a lot of requirements which need to be reached under the constraint. Moreover, the problem will have a lot of data which need to be accessed because it is a real life problem. So a data base management system is needed. In this thesis, we will point out the key points of cabin crew scheduling problem. We will discuss how to select a suitable constraint expression for the constraint and how to do the assignment operation, and we will propose the abstraction architecture for our implementation of cabin crew scheduling problem. We will just discuss the concept and the abstraction of the problem. We will not describe the detail about how to implement them.
author2 Hsu,Ching-Chi
author_facet Hsu,Ching-Chi
Hu,Chih-Ching
胡志青
author Hu,Chih-Ching
胡志青
spellingShingle Hu,Chih-Ching
胡志青
A Crew Scheduling System based on Constraint Logic Programming
author_sort Hu,Chih-Ching
title A Crew Scheduling System based on Constraint Logic Programming
title_short A Crew Scheduling System based on Constraint Logic Programming
title_full A Crew Scheduling System based on Constraint Logic Programming
title_fullStr A Crew Scheduling System based on Constraint Logic Programming
title_full_unstemmed A Crew Scheduling System based on Constraint Logic Programming
title_sort crew scheduling system based on constraint logic programming
publishDate 1993
url http://ndltd.ncl.edu.tw/handle/54350381689637390075
work_keys_str_mv AT huchihching acrewschedulingsystembasedonconstraintlogicprogramming
AT húzhìqīng acrewschedulingsystembasedonconstraintlogicprogramming
AT huchihching jiàngòuyúxiànzhìshìluójíchéngshìshèjìfāngfǎzhīrényuánpáibānxìtǒng
AT húzhìqīng jiàngòuyúxiànzhìshìluójíchéngshìshèjìfāngfǎzhīrényuánpáibānxìtǒng
AT huchihching crewschedulingsystembasedonconstraintlogicprogramming
AT húzhìqīng crewschedulingsystembasedonconstraintlogicprogramming
_version_ 1718185267459784704