A method to solve the FMS production scheduling problem for a make-to-stock factory
碩士 === 國立交通大學 === 工業工程研究所 === 77 ===
Main Authors: | LI, ZHONG-RU, 李宗儒 |
---|---|
Other Authors: | ZHONG, SU-XING |
Format: | Others |
Language: | zh-TW |
Published: |
1989
|
Online Access: | http://ndltd.ncl.edu.tw/handle/76636634540689556539 |
Similar Items
-
From the scheduling point of view to solve the tools assignment problem in FMS
by: CHEN, ZHENG-HUA, et al.
Published: (1989) -
Using Version Space Approach And Conceptual Clustering TO Solve The Scheduling Problems in FMS
by: Chen Shenq Ming, et al.
Published: (1993) -
The Investigation of Scheduling Problem with Transportation Time in FMS
by: Huang,Wei Yeh, et al.
Published: (1994) -
Solving FMS Assignment Problem with Grouping Genetic Algorithm
by: M.H.M.A. Jahromi, et al.
Published: (2012-12-01) -
A Study on Scheduling and On-line Diagnostic Platform for FMS
by: Tsung-te Yu, et al.
Published: (2003)