<p> People in developing countries have limited access to electricity, especially in rural and remote areas. As electricity consumption is correlated with economic development, the lack of access to electricity is a key obstacle to achieving economic growth. Techniques for improving access to...

Full description

Bibliographic Details
Main Author: Murphy, Patrick Mark
Language:EN
Published: The George Washington University 2016
Subjects:
Online Access:http://pqdtopen.proquest.com/#viewpdf?dispub=10006255
id ndltd-PROQUEST-oai-pqdtoai.proquest.com-10006255
record_format oai_dc
spelling ndltd-PROQUEST-oai-pqdtoai.proquest.com-100062552016-02-05T04:09:47Z A Method for Determining the Cost of Highly Available Electricity Considering Grid Unavailability| A case study and applied analysis in Uganda Murphy, Patrick Mark Alternative Energy|Engineering|Operations research <p> People in developing countries have limited access to electricity, especially in rural and remote areas. As electricity consumption is correlated with economic development, the lack of access to electricity is a key obstacle to achieving economic growth. Techniques for improving access to electricity include grid extension and distributed energy resources (DER), but analyzing the tradeoff between grid extension and distributed generation requires a better understanding of the impacts of grid unreliability. In this dissertation, a new method for simulating unreliable electric grids is presented. The method is then used to determine the cost of reliable electricity in areas where the grid is unreliable. The method is extended in order to calculate the distance at which grid extension of an unreliable grid and DER have the same cost, a point known as the economic distance limit (EDL). Finally, the method is applied to analyze the impact of grid sell-back prices on electricity cost and EDL. The methods are demonstrated for a village in Uganda, but hold universally. Results indicate that demand for increased availability increases cost, but now the cost per unit of availability can be calculated and used in decision making. Similarly, with fixed demand availability, we see increasing costs as grid availability decreases. This also results in EDL decreasing as grid availability decreases, as there is little value in extending a grid that functions poorly. From the simulation results, linear approximations of some of the key outputs are developed and are demonstrated to be consistent with results. These provide a method for rapidly calculating electricity costs and EDL without the need to perform numerous simulations. Simple calculations for cost of highly available electricity will enable more informed choices for grid-tied and stand-alone electricity generation for system operators and for policy makers.</p> The George Washington University 2016-02-04 00:00:00.0 thesis http://pqdtopen.proquest.com/#viewpdf?dispub=10006255 EN
collection NDLTD
language EN
sources NDLTD
topic Alternative Energy|Engineering|Operations research
spellingShingle Alternative Energy|Engineering|Operations research
Murphy, Patrick Mark
A Method for Determining the Cost of Highly Available Electricity Considering Grid Unavailability| A case study and applied analysis in Uganda
description <p> People in developing countries have limited access to electricity, especially in rural and remote areas. As electricity consumption is correlated with economic development, the lack of access to electricity is a key obstacle to achieving economic growth. Techniques for improving access to electricity include grid extension and distributed energy resources (DER), but analyzing the tradeoff between grid extension and distributed generation requires a better understanding of the impacts of grid unreliability. In this dissertation, a new method for simulating unreliable electric grids is presented. The method is then used to determine the cost of reliable electricity in areas where the grid is unreliable. The method is extended in order to calculate the distance at which grid extension of an unreliable grid and DER have the same cost, a point known as the economic distance limit (EDL). Finally, the method is applied to analyze the impact of grid sell-back prices on electricity cost and EDL. The methods are demonstrated for a village in Uganda, but hold universally. Results indicate that demand for increased availability increases cost, but now the cost per unit of availability can be calculated and used in decision making. Similarly, with fixed demand availability, we see increasing costs as grid availability decreases. This also results in EDL decreasing as grid availability decreases, as there is little value in extending a grid that functions poorly. From the simulation results, linear approximations of some of the key outputs are developed and are demonstrated to be consistent with results. These provide a method for rapidly calculating electricity costs and EDL without the need to perform numerous simulations. Simple calculations for cost of highly available electricity will enable more informed choices for grid-tied and stand-alone electricity generation for system operators and for policy makers.</p>
author Murphy, Patrick Mark
author_facet Murphy, Patrick Mark
author_sort Murphy, Patrick Mark
title A Method for Determining the Cost of Highly Available Electricity Considering Grid Unavailability| A case study and applied analysis in Uganda
title_short A Method for Determining the Cost of Highly Available Electricity Considering Grid Unavailability| A case study and applied analysis in Uganda
title_full A Method for Determining the Cost of Highly Available Electricity Considering Grid Unavailability| A case study and applied analysis in Uganda
title_fullStr A Method for Determining the Cost of Highly Available Electricity Considering Grid Unavailability| A case study and applied analysis in Uganda
title_full_unstemmed A Method for Determining the Cost of Highly Available Electricity Considering Grid Unavailability| A case study and applied analysis in Uganda
title_sort method for determining the cost of highly available electricity considering grid unavailability| a case study and applied analysis in uganda
publisher The George Washington University
publishDate 2016
url http://pqdtopen.proquest.com/#viewpdf?dispub=10006255
work_keys_str_mv AT murphypatrickmark amethodfordeterminingthecostofhighlyavailableelectricityconsideringgridunavailabilityacasestudyandappliedanalysisinuganda
AT murphypatrickmark methodfordeterminingthecostofhighlyavailableelectricityconsideringgridunavailabilityacasestudyandappliedanalysisinuganda
_version_ 1718178644184006656