Pressurizer surge line Counter Current Flow Limitation during AP600 Mode 5 Cold Shutdown

Counter Current Flow Limitation (CCFL) was observed in the pressurizer surge line of the Oregon State University APEX facility during test NRC-10. This test simulated a one-inch diameter cold leg break with a failure of three of four of the fourth-stage Automatic Depressurization System (ADS) valves...

Full description

Bibliographic Details
Main Author: Colpo, Sarah E.
Other Authors: Reyes, Jose N. Jr
Language:en_US
Published: 2012
Subjects:
Online Access:http://hdl.handle.net/1957/33578

Similar Items