The development of a system to optimise production costs around complex electricity tariffs / R. Maneschijn.
Rising South African electricity prices and reduced sales following the 2008 economic recession have led cement manufacturers to seek ways to reduce production costs. Prior research has shown that reduced electricity costs are possible by shifting load from expensive Eskom peak pricing periods to lo...
Main Author: | Maneschijn, Raynard |
---|---|
Language: | en |
Published: |
North-West University
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/10394/9675 |
Similar Items
-
The development of a system to optimise production costs around complex electricity tariffs / R. Maneschijn.
by: Maneschijn, Raynard
Published: (2013) -
Consumers’ Willingness to Accept Time-of-Use Tariffs for Shifting Electricity Demand
by: Swantje Sundt, et al.
Published: (2020-04-01) -
Implementing DSM interventions on water reticulation systems of marginal deep level mines / Adriaan Petrus van Niekerk
by: Van Niekerk, Adriaan Petrus
Published: (2014) -
Implementing DSM interventions on water reticulation systems of marginal deep level mines / Adriaan Petrus van Niekerk
by: Van Niekerk, Adriaan Petrus
Published: (2014) -
Analysing the effect of DSM projects at South African cement factories / Johannes Paulus Spangenberg
by: Spangenberg, Johannes Paulus
Published: (2016)