Research and implementation of a load reduction system for a mine refrigeration system / Jan-Johan Calitz
In this study, a system was developed to shift electrical load out of Eskom's peak period to the OR-peak periods. This system was designed, based on research done for load shift philosophies of a refrigeration system of a mine. The investigation focussed on the mining industry, for it consumes...
Main Author: | Calitz, Jan-Johan |
---|---|
Published: |
North-West University
2009
|
Online Access: | http://hdl.handle.net/10394/1690 |
Similar Items
-
Research and implementation of a load reduction system for a mine refrigeration system / Jan-Johan Calitz
by: Calitz, Jan-Johan
Published: (2009) -
Experiences of women in the platinum mining industry / Pearl Louise Calitz
by: Calitz, Pearl Louise
Published: (2009) -
Experiences of women in the platinum mining industry / Pearl Louise Calitz
by: Calitz, Pearl Louise
Published: (2009) -
Optimising the refrigeration and cooling system of a platinum mine / Johan Leon Buys
by: Buys, Johan Leon
Published: (2015) -
Optimising the refrigeration and cooling system of a platinum mine / Johan Leon Buys
by: Buys, Johan Leon
Published: (2015)