Risk assessment for international development projects: owner's perspective.
Risk analysis as an effective tool for planning and controlling cost and schedule has not been fully utilized in the construction industry, especially in projects implemented in the developing world. Planning techniques used in developing countries tend to be less sophisticated in prediction of risk...
Published: |
|
---|---|
Online Access: | http://hdl.handle.net/2047/d10019169 |
Similar Items
-
Assessment of Owner Risk Associated with Airport Capital and Maintenance Projects
by: Ehiemere, Chidozie
Published: (2018) -
The Study of Risk Management of MRT Project in Construction Stage – The Owner’s Perspective
by: Yung-Chang Hsieh, et al.
Published: (2010) -
(Dis)Trust, Control, and Project Success: From a Chinese Project Owner’s Perspective
by: Weiping Jiang, et al.
Published: (2017-10-01) -
The assessment of risks caused by owner's delayed payments
by: Budawara, Nasma
Published: (1999) -
Analysis of Time Slippage for Construction Projects in Public
Sector: Owner’s Perspective
by: Misbah Jamil, et al.
Published: (2012-10-01)