multi-criteria approach for remanufacturing model in a disassembly-to-order system
We present a disassembly-to-order system applied in a multi-period environment where the products are taken back from the last user and/or collectors, disassembled for the retrieval of reusable items and resold (or used) in order to meet a certain level of demand for components or subassemblies. The...
Published: |
|
---|---|
Online Access: | http://hdl.handle.net/2047/d10013775 |
Similar Items
-
A Heuristic for Disassembly Planning in Remanufacturing System
by: Jinmo Sung, et al.
Published: (2014-01-01) -
PRODUCT DISASSEMBLABILITY AND REMANUFACTURABILITY ASSESSMENT: A QUANTITATIVE APPROACH
by: Ali, Ammar
Published: (2017) -
Design and analysis of disassembly and remanufacturing systems in the electronics industry
Published: () -
A strategic operations framework for disassembly in remanufacturing
by: Priyono, Anjar
Published: (2015) -
Calculating disassembly yields in a multi-criteria decision making environment for a disassembly to order system
Published: ()