Use of flexible kanban for material flow control in a disassembly process

Disassembly is one of the proposed solutions to the increased environmental problem of large-scale disposal of manufactured products. Disassembly process brings with it a lot of unresolved material control issues. In this paper we illustrate the implementation of the recently developed Flexible Kanb...

Full description

Bibliographic Details
Published:
Online Access:http://hdl.handle.net/2047/d10014019
id ndltd-NEU--neu-378059
record_format oai_dc
spelling ndltd-NEU--neu-3780592016-04-25T16:16:17ZUse of flexible kanban for material flow control in a disassembly processDisassembly is one of the proposed solutions to the increased environmental problem of large-scale disposal of manufactured products. Disassembly process brings with it a lot of unresolved material control issues. In this paper we illustrate the implementation of the recently developed Flexible Kanban System to cope with the uncertainties that are unique to the disassembly system.http://hdl.handle.net/2047/d10014019
collection NDLTD
sources NDLTD
description Disassembly is one of the proposed solutions to the increased environmental problem of large-scale disposal of manufactured products. Disassembly process brings with it a lot of unresolved material control issues. In this paper we illustrate the implementation of the recently developed Flexible Kanban System to cope with the uncertainties that are unique to the disassembly system.
title Use of flexible kanban for material flow control in a disassembly process
spellingShingle Use of flexible kanban for material flow control in a disassembly process
title_short Use of flexible kanban for material flow control in a disassembly process
title_full Use of flexible kanban for material flow control in a disassembly process
title_fullStr Use of flexible kanban for material flow control in a disassembly process
title_full_unstemmed Use of flexible kanban for material flow control in a disassembly process
title_sort use of flexible kanban for material flow control in a disassembly process
publishDate
url http://hdl.handle.net/2047/d10014019
_version_ 1718236149269397504