Sudden material handling system breakdown in a disassembly line
In this paper we study the effect of the sudden breakdown of material handling equipment on the performance of recently introduced MKSD (Modified Kanban System for Disassembly). We also study behavior of a newly developed JIT system for disassembly called DKSDL (Dynamic Kanban System for Disassembly...
Published: |
|
---|---|
Online Access: | http://hdl.handle.net/2047/d10013490 |