Interior of Cage Under Construction, Winter 1954.
View of the interior of the cage in Cabot Gym while under construction in the winter of 1954.
Published: |
|
---|---|
Online Access: | http://hdl.handle.net/2047/d20155233 |
Similar Items
-
Caging the seas: cetacean capture and display at Marineland of the Pacific, 1954-1967
by: Griffin, Isobel
Published: (2018) -
R. de Winter, E. van Loo, Luchtmachtbevelhebbers geportretteerd 1954-2005
by: Ph.M. Bosscher
Published: (2007-01-01) -
R. de Winter, E. van Loo, Luchtmachtbevelhebbers geportretteerd 1954-2005
by: Ph.M. Bosscher
Published: (2007-01-01) -
R. de Winter, E. van Loo, Luchtmachtbevelhebbers geportretteerd 1954-2005
by: Ph.M. Bosscher
Published: (2007-01-01) -
1953-1954,1954-1955 Biennial Catalogue
by: University of Arizona
Published: (1953)