Bottleneck identification in cycle time reduction and throughput improvement efforts in an automotive transmission plant
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; and, (S.M.)--Massachusetts Institute of Technology, Sloan School of Management, 1999. === Includes bibliographical references (p. 71). === A critical step in many improvement methodologies is the identification of...
Main Author: | Longcore, Jeff R. M. (Jeff Ray Maher), 1967- |
---|---|
Other Authors: | David E. Hardt and Donald B. Rosenfield. |
Format: | Others |
Language: | English |
Published: |
Massachusetts Institute of Technology
2005
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/9432 |
Similar Items
-
Throughput improvement initiatives in an automotive assembly plant body shop
by: Cassidy, Mark (Mark Anthony), 1971-
Published: (2005) -
Constraint analysis and throughput improvement at an automotive assembly plant
by: Valdés R., José Leoncio, 1973-
Published: (2014) -
Process and productivity improvements through bottleneck reduction and design of experiments
by: Oliver, Lawrence R. (Lawrence Robert)
Published: (2007) -
Implications of two-sided advertising in the automotive industry
by: Luke, Jeffrey O. (Jeffrey Oliver), 1967-, et al.
Published: (2010) -
Automotive electronics business
by: Hase, Yoshiko, M.B.A. Massachusetts Institute of Technology
Published: (2007)