Assessing materials risk in purchased electronic components during product design
Thesis (S.M.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2002. === Includes bibliographical references. === by Jennifer A. R...
Main Author: | Rigoni, Jennifer A. (Jennifer Anne), 1974- |
---|---|
Other Authors: | Daniel E. Whitney and Sara L. Beckman. |
Format: | Others |
Language: | English |
Published: |
Massachusetts Institute of Technology
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/84329 |
Similar Items
-
Implementing variation risk management during product development
by: Padgalskas, Nicholas (Nicholas Keith)
Published: (2007) -
An analysis of engine assembly and component production behavior
by: Blake, Thomas B. (Thomas Brock), 1969-
Published: (2009) -
An alternative method of long lead-time tool purchases
by: Partlan, Eric W. (Eric William), 1973-
Published: (2014) -
Concurrently designing a physical production system and an information system in a manufacturing setting
by: Katzen, James Alexander Scott, 1974-
Published: (2007) -
Driving a lean transformation using a six sigma improvement process
by: Krishnan, Satish, 1974-
Published: (2006)