Risks and decision making in development of new power plant projects

Thesis (Ph. D. in the field of Construction Engineering and Management)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2012. === Cataloged from PDF version of thesis. === Includes bibliographical references (p. 204-209). === Power plant development projects are...

Full description

Bibliographic Details
Main Author: Kristinsdottir, Asbjorg
Other Authors: Fred Moavenzadeh.
Format: Others
Language:English
Published: Massachusetts Institute of Technology 2013
Subjects:
Online Access:http://hdl.handle.net/1721.1/78233
id ndltd-MIT-oai-dspace.mit.edu-1721.1-78233
record_format oai_dc
spelling ndltd-MIT-oai-dspace.mit.edu-1721.1-782332019-05-02T16:30:04Z Risks and decision making in development of new power plant projects Kristinsdottir, Asbjorg Fred Moavenzadeh. Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering. Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering. Civil and Environmental Engineering. Thesis (Ph. D. in the field of Construction Engineering and Management)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2012. Cataloged from PDF version of thesis. Includes bibliographical references (p. 204-209). Power plant development projects are typically capital intensive and subject to a complex network of interconnected risks that impact development's performance. Failure to develop a power plant to meet performance constraints can come at great cost to the developer and other stakeholders involved. In order to develop an investment strategy plan based on their risk appetite, and manage risks effectively, developers must be able to identify and analyze project opportunity risks. This dissertation is motivated by the need to study the nature and impact of risks on a power plant development project, and to demonstrate how proper management of those risks can help mitigate these impacts. The purpose is to feed that information into developer's investment strategy to be able to understand whether or not to participate in particular power plant development projects, and how to participate. First phase of the dissertation is an analysis of power plant investment decisions and development process, followed by identification of risks across all stages of development. Through data mining of performance indicators of around 300 power plant development projects worldwide, clusters of geographical locations, energy technologies, and developer types are highlighted. This helps us understand which projects developers should consider for evaluation given performance trends of geographic locations, and energy technologies. Our research then introduces a novel approach to power plant project risk analysis. We combine a System Dynamics model of the power plant development process with an Analytical Network Process model that enables identification of key relationships among risks and their impact on the development process. The models are used to construct project risk profiles. These three models work together to show how developers can make risk informed decision when selecting amongst power plant project opportunities, how they should best prepare projects to mitigate negative impacts of risks involved, and how they should react to changes in managing development performance over a project's lifetime. by Ásbjörg Kristinsdóttir. Ph.D.in the field of Construction Engineering and Management 2013-03-28T18:24:10Z 2013-03-28T18:24:10Z 2012 2012 Thesis http://hdl.handle.net/1721.1/78233 829236396 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 245 p. application/pdf Massachusetts Institute of Technology
collection NDLTD
language English
format Others
sources NDLTD
topic Civil and Environmental Engineering.
spellingShingle Civil and Environmental Engineering.
Kristinsdottir, Asbjorg
Risks and decision making in development of new power plant projects
description Thesis (Ph. D. in the field of Construction Engineering and Management)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2012. === Cataloged from PDF version of thesis. === Includes bibliographical references (p. 204-209). === Power plant development projects are typically capital intensive and subject to a complex network of interconnected risks that impact development's performance. Failure to develop a power plant to meet performance constraints can come at great cost to the developer and other stakeholders involved. In order to develop an investment strategy plan based on their risk appetite, and manage risks effectively, developers must be able to identify and analyze project opportunity risks. This dissertation is motivated by the need to study the nature and impact of risks on a power plant development project, and to demonstrate how proper management of those risks can help mitigate these impacts. The purpose is to feed that information into developer's investment strategy to be able to understand whether or not to participate in particular power plant development projects, and how to participate. First phase of the dissertation is an analysis of power plant investment decisions and development process, followed by identification of risks across all stages of development. Through data mining of performance indicators of around 300 power plant development projects worldwide, clusters of geographical locations, energy technologies, and developer types are highlighted. This helps us understand which projects developers should consider for evaluation given performance trends of geographic locations, and energy technologies. Our research then introduces a novel approach to power plant project risk analysis. We combine a System Dynamics model of the power plant development process with an Analytical Network Process model that enables identification of key relationships among risks and their impact on the development process. The models are used to construct project risk profiles. These three models work together to show how developers can make risk informed decision when selecting amongst power plant project opportunities, how they should best prepare projects to mitigate negative impacts of risks involved, and how they should react to changes in managing development performance over a project's lifetime. === by Ásbjörg Kristinsdóttir. === Ph.D.in the field of Construction Engineering and Management
author2 Fred Moavenzadeh.
author_facet Fred Moavenzadeh.
Kristinsdottir, Asbjorg
author Kristinsdottir, Asbjorg
author_sort Kristinsdottir, Asbjorg
title Risks and decision making in development of new power plant projects
title_short Risks and decision making in development of new power plant projects
title_full Risks and decision making in development of new power plant projects
title_fullStr Risks and decision making in development of new power plant projects
title_full_unstemmed Risks and decision making in development of new power plant projects
title_sort risks and decision making in development of new power plant projects
publisher Massachusetts Institute of Technology
publishDate 2013
url http://hdl.handle.net/1721.1/78233
work_keys_str_mv AT kristinsdottirasbjorg risksanddecisionmakingindevelopmentofnewpowerplantprojects
_version_ 1719042064670261248