Implementation through governmental bureaucracy : a study of the factors that cause projects implementation delay in Egypt

Thesis (M.C.P.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, 1985. === MICROFICHE COPY AVAILABLE IN ARCHIVES AND ROTCH. === Bibliography: leaves 146-149. === by Faten Ahmed Moustafa Gaimee. === M.C.P.

Bibliographic Details
Main Author: Gamiee, Faten Ahmed Moustafa
Other Authors: Ralph Gakenheimer.
Format: Others
Language:English
Published: Massachusetts Institute of Technology 2012
Subjects:
Online Access:http://hdl.handle.net/1721.1/73747
id ndltd-MIT-oai-dspace.mit.edu-1721.1-73747
record_format oai_dc
spelling ndltd-MIT-oai-dspace.mit.edu-1721.1-737472019-05-02T15:56:45Z Implementation through governmental bureaucracy : a study of the factors that cause projects implementation delay in Egypt Gamiee, Faten Ahmed Moustafa Ralph Gakenheimer. Massachusetts Institute of Technology. Dept. of Urban Studies and Planning. Massachusetts Institute of Technology. Dept. of Urban Studies and Planning. Urban Studies and Planning. Thesis (M.C.P.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, 1985. MICROFICHE COPY AVAILABLE IN ARCHIVES AND ROTCH. Bibliography: leaves 146-149. by Faten Ahmed Moustafa Gaimee. M.C.P. 2012-10-10T15:41:20Z 2012-10-10T15:41:20Z 1984 1985 Thesis http://hdl.handle.net/1721.1/73747 13406290 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 [1], 149 leaves application/pdf Massachusetts Institute of Technology
collection NDLTD
language English
format Others
sources NDLTD
topic Urban Studies and Planning.
spellingShingle Urban Studies and Planning.
Gamiee, Faten Ahmed Moustafa
Implementation through governmental bureaucracy : a study of the factors that cause projects implementation delay in Egypt
description Thesis (M.C.P.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, 1985. === MICROFICHE COPY AVAILABLE IN ARCHIVES AND ROTCH. === Bibliography: leaves 146-149. === by Faten Ahmed Moustafa Gaimee. === M.C.P.
author2 Ralph Gakenheimer.
author_facet Ralph Gakenheimer.
Gamiee, Faten Ahmed Moustafa
author Gamiee, Faten Ahmed Moustafa
author_sort Gamiee, Faten Ahmed Moustafa
title Implementation through governmental bureaucracy : a study of the factors that cause projects implementation delay in Egypt
title_short Implementation through governmental bureaucracy : a study of the factors that cause projects implementation delay in Egypt
title_full Implementation through governmental bureaucracy : a study of the factors that cause projects implementation delay in Egypt
title_fullStr Implementation through governmental bureaucracy : a study of the factors that cause projects implementation delay in Egypt
title_full_unstemmed Implementation through governmental bureaucracy : a study of the factors that cause projects implementation delay in Egypt
title_sort implementation through governmental bureaucracy : a study of the factors that cause projects implementation delay in egypt
publisher Massachusetts Institute of Technology
publishDate 2012
url http://hdl.handle.net/1721.1/73747
work_keys_str_mv AT gamieefatenahmedmoustafa implementationthroughgovernmentalbureaucracyastudyofthefactorsthatcauseprojectsimplementationdelayinegypt
_version_ 1719032022031138816