Lean transformation and relocation of jet engine assembly operations
Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Global Operations Program at MIT, 2011. === Cataloged from PDF version of thesis. === Includes...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | English |
Published: |
Massachusetts Institute of Technology
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/66073 |
id |
ndltd-MIT-oai-dspace.mit.edu-1721.1-66073 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-MIT-oai-dspace.mit.edu-1721.1-660732019-05-02T15:47:48Z Lean transformation and relocation of jet engine assembly operations Hale, Stephen Andrew Daniel Whitney and Roy Welsch. Leaders for Global Operations Program. Sloan School of Management. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Leaders for Global Operations Program. Sloan School of Management. Mechanical Engineering. Leaders for Global Operations Program. Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Global Operations Program at MIT, 2011. Cataloged from PDF version of thesis. Includes bibliographical references (p. 75-76). As part of continuing lean transformation efforts at Pratt & Whitney, the Middletown Engine Center has turned its focus on the GP7000 turbofan engine as a target for lean implementation. Projected increases in GP7000 production volume over the next few years, along with aggressive cost reduction targets, are driving the current push to optimize GP7000 assembly and test operations. The internship work described in this thesis was sponsored to achieve three primary objectives: (1) Identify and then implement opportunities to reduce waste and increase productivity for GP7000 assembly and test, (2) determine an optimal configuration for restructuring GP7000 assembly and test operations and create a business case demonstrating the value of the proposed configuration, and (3) organize an implementation team and begin execution of a GP7000 strategy. This thesis details an approach for lean transformation of assembly and test operations in an aerospace company. Additionally, the thesis provides a framework for making difficult relocation decisions and shows how lean transformation can be part of an assembly relocation strategy. As a direct result of this work a lean transformation and relocation strategy is in place for the GP7000 and the implementation of that strategy was underway at the conclusion of the internship. The thesis also describes a comprehensive risk management plan that employs the Operational Risk Management (ORM) process from the U.S. Air Force together with a phased implementation approach. by Stephen Andrew Hale. S.M. M.B.A. 2011-09-27T18:39:46Z 2011-09-27T18:39:46Z 2011 2011 Thesis http://hdl.handle.net/1721.1/66073 753711035 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 76 p. application/pdf Massachusetts Institute of Technology |
collection |
NDLTD |
language |
English |
format |
Others
|
sources |
NDLTD |
topic |
Sloan School of Management. Mechanical Engineering. Leaders for Global Operations Program. |
spellingShingle |
Sloan School of Management. Mechanical Engineering. Leaders for Global Operations Program. Hale, Stephen Andrew Lean transformation and relocation of jet engine assembly operations |
description |
Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Global Operations Program at MIT, 2011. === Cataloged from PDF version of thesis. === Includes bibliographical references (p. 75-76). === As part of continuing lean transformation efforts at Pratt & Whitney, the Middletown Engine Center has turned its focus on the GP7000 turbofan engine as a target for lean implementation. Projected increases in GP7000 production volume over the next few years, along with aggressive cost reduction targets, are driving the current push to optimize GP7000 assembly and test operations. The internship work described in this thesis was sponsored to achieve three primary objectives: (1) Identify and then implement opportunities to reduce waste and increase productivity for GP7000 assembly and test, (2) determine an optimal configuration for restructuring GP7000 assembly and test operations and create a business case demonstrating the value of the proposed configuration, and (3) organize an implementation team and begin execution of a GP7000 strategy. This thesis details an approach for lean transformation of assembly and test operations in an aerospace company. Additionally, the thesis provides a framework for making difficult relocation decisions and shows how lean transformation can be part of an assembly relocation strategy. As a direct result of this work a lean transformation and relocation strategy is in place for the GP7000 and the implementation of that strategy was underway at the conclusion of the internship. The thesis also describes a comprehensive risk management plan that employs the Operational Risk Management (ORM) process from the U.S. Air Force together with a phased implementation approach. === by Stephen Andrew Hale. === S.M. === M.B.A. |
author2 |
Daniel Whitney and Roy Welsch. |
author_facet |
Daniel Whitney and Roy Welsch. Hale, Stephen Andrew |
author |
Hale, Stephen Andrew |
author_sort |
Hale, Stephen Andrew |
title |
Lean transformation and relocation of jet engine assembly operations |
title_short |
Lean transformation and relocation of jet engine assembly operations |
title_full |
Lean transformation and relocation of jet engine assembly operations |
title_fullStr |
Lean transformation and relocation of jet engine assembly operations |
title_full_unstemmed |
Lean transformation and relocation of jet engine assembly operations |
title_sort |
lean transformation and relocation of jet engine assembly operations |
publisher |
Massachusetts Institute of Technology |
publishDate |
2011 |
url |
http://hdl.handle.net/1721.1/66073 |
work_keys_str_mv |
AT halestephenandrew leantransformationandrelocationofjetengineassemblyoperations |
_version_ |
1719028499954532352 |