High performance in Procurement Risk Management

Thesis (S.M. in System Design and Management)--Massachusetts Institute of Technology, Engineering Systems Division, 2010. === Cataloged from PDF version of thesis. === Includes bibliographical references. === Research on Procurement Risk Management has been conducted by Accenture and MIT in order to...

Full description

Bibliographic Details
Main Author: Olsha, Maya (Olsha-Yehiav)
Other Authors: David Simchi-Levi.
Format: Others
Language:English
Published: Massachusetts Institute of Technology 2010
Subjects:
Online Access:http://hdl.handle.net/1721.1/59262
id ndltd-MIT-oai-dspace.mit.edu-1721.1-59262
record_format oai_dc
spelling ndltd-MIT-oai-dspace.mit.edu-1721.1-592622019-05-02T15:43:08Z High performance in Procurement Risk Management High performance in PRM Olsha, Maya (Olsha-Yehiav) David Simchi-Levi. System Design and Management Program. Massachusetts Institute of Technology. Engineering Systems Division. System Design and Management Program. Engineering Systems Division. System Design and Management Program. Thesis (S.M. in System Design and Management)--Massachusetts Institute of Technology, Engineering Systems Division, 2010. Cataloged from PDF version of thesis. Includes bibliographical references. Research on Procurement Risk Management has been conducted by Accenture and MIT in order to identify the best practices used to manage commodity price volatility and supplier risk. In today's increasingly turbulent market it is crucial for companies to have their procurement risk management capabilities developed. Risk Management becomes imperative for buyers in order to make the best business decisions and continue to drive their performance up. Risk Management is now becoming a major requirement for Procurement departments, and while most companies have risk-management expertise within their finance departments, only a few formally extend this capacity into the procurement department. Excellence in managing risks will be a key differentiator for procurement departments in the near future. The main risk categories today are suppliers and price risks. These risks can be managed by different sets of capabilities in an effort to reduce a possible impact. The risk management process contains three main stages; risk anticipation, risk identification and monitoring, and risk mitigation. As all stages are important to master, some capabilities have shown clearer correlation than others. By conducting an extended literature review, procurement top management personnel interviews, and brainstorming sessions with Accenture, a set of hypotheses were formed. This set of hypotheses was verified against the results of a survey. The survey contained an extended set of questions that revolved around each hypothesis. This survey was answered by 122 companies from various industries. The main conclusions are based on observations and detailed analysis of survey results. A lack of impact measuring and a lack of use of technology for the purpose of risk assessment were observed. It is believed that improving these capabilities will promote profitability, and prevent impact as a result of risky events. Based on the results analysis, the procurement performance level is heavily dependant on risk management measures, and that excelling at the procurement level can be reflected further on the overall success of the company. by Maya Olsha. S.M.in System Design and Management 2010-10-12T19:00:29Z 2010-10-12T19:00:29Z 2010 2010 Thesis http://hdl.handle.net/1721.1/59262 667706662 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 92 p. application/pdf Massachusetts Institute of Technology
collection NDLTD
language English
format Others
sources NDLTD
topic Engineering Systems Division.
System Design and Management Program.
spellingShingle Engineering Systems Division.
System Design and Management Program.
Olsha, Maya (Olsha-Yehiav)
High performance in Procurement Risk Management
description Thesis (S.M. in System Design and Management)--Massachusetts Institute of Technology, Engineering Systems Division, 2010. === Cataloged from PDF version of thesis. === Includes bibliographical references. === Research on Procurement Risk Management has been conducted by Accenture and MIT in order to identify the best practices used to manage commodity price volatility and supplier risk. In today's increasingly turbulent market it is crucial for companies to have their procurement risk management capabilities developed. Risk Management becomes imperative for buyers in order to make the best business decisions and continue to drive their performance up. Risk Management is now becoming a major requirement for Procurement departments, and while most companies have risk-management expertise within their finance departments, only a few formally extend this capacity into the procurement department. Excellence in managing risks will be a key differentiator for procurement departments in the near future. The main risk categories today are suppliers and price risks. These risks can be managed by different sets of capabilities in an effort to reduce a possible impact. The risk management process contains three main stages; risk anticipation, risk identification and monitoring, and risk mitigation. As all stages are important to master, some capabilities have shown clearer correlation than others. By conducting an extended literature review, procurement top management personnel interviews, and brainstorming sessions with Accenture, a set of hypotheses were formed. This set of hypotheses was verified against the results of a survey. The survey contained an extended set of questions that revolved around each hypothesis. This survey was answered by 122 companies from various industries. The main conclusions are based on observations and detailed analysis of survey results. A lack of impact measuring and a lack of use of technology for the purpose of risk assessment were observed. It is believed that improving these capabilities will promote profitability, and prevent impact as a result of risky events. Based on the results analysis, the procurement performance level is heavily dependant on risk management measures, and that excelling at the procurement level can be reflected further on the overall success of the company. === by Maya Olsha. === S.M.in System Design and Management
author2 David Simchi-Levi.
author_facet David Simchi-Levi.
Olsha, Maya (Olsha-Yehiav)
author Olsha, Maya (Olsha-Yehiav)
author_sort Olsha, Maya (Olsha-Yehiav)
title High performance in Procurement Risk Management
title_short High performance in Procurement Risk Management
title_full High performance in Procurement Risk Management
title_fullStr High performance in Procurement Risk Management
title_full_unstemmed High performance in Procurement Risk Management
title_sort high performance in procurement risk management
publisher Massachusetts Institute of Technology
publishDate 2010
url http://hdl.handle.net/1721.1/59262
work_keys_str_mv AT olshamayaolshayehiav highperformanceinprocurementriskmanagement
AT olshamayaolshayehiav highperformanceinprm
_version_ 1719027035504902144