Implementing various lean methodologies and creating a business development plan at an ABB Greenfield site

Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2009. === Includes bibliographical references (p. XX). === As par...

Full description

Bibliographic Details
Main Author: Sosa Rangel, Miguel Ernesto
Other Authors: Stanley B. Gershwin and Roy E. Welsch.
Format: Others
Language:English
Published: Massachusetts Institute of Technology 2009
Subjects:
Online Access:http://hdl.handle.net/1721.1/50088
id ndltd-MIT-oai-dspace.mit.edu-1721.1-50088
record_format oai_dc
spelling ndltd-MIT-oai-dspace.mit.edu-1721.1-500882019-05-02T16:22:18Z Implementing various lean methodologies and creating a business development plan at an ABB Greenfield site Sosa Rangel, Miguel Ernesto Stanley B. Gershwin and Roy E. Welsch. Leaders for Manufacturing Program. Sloan School of Management. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Leaders for Manufacturing Program. Sloan School of Management. Mechanical Engineering. Leaders for Manufacturing Program. Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2009. Includes bibliographical references (p. XX). As part of its strategic initiatives, ABB inaugurated a 100,000 sq-m campus for an Engineering, Sourcing, and Manufacturing Operations center in San Luis Potosi (SLP), Mexico in May 2008. The ramp-up of the SLP site encompassed two focus areas that are the topics for this thesis. The first area of focus was to create a business development guide that supports Mexican and North American division managers, plant managers, and their supporting personnel to successfully establish new business in SLP. Having such a guide available is expected to reduce start-up time of operations, increase decision-making speed, improve productivity in multi-divisional projects, and ultimately increase potential internal business opportunities. This thesis presents a case study on how this guide was designed, developed, and implemented. The second focus area was to implement several Lean principles, the most significant one being "5S." A case study on its planned application, procedure to measure implementation level and effectiveness on quality, productivity, and on-time delivery is discussed. A discussion on the stronger emphasis by management on implementation measurement versus effectiveness measurement and possible reasons for this gap of expectations is also presented. Finally, the production area for the Robot Refurbishment line was redesigned based on the target of reducing factory floor space for use in other ventures, meanwhile simultaneously increasing lead times in the manufacturing process. by Miguel Ernesto Sosa Rangel. S.M. M.B.A. 2009-12-10T19:10:47Z 2009-12-10T19:10:47Z 2009 2009 Thesis http://hdl.handle.net/1721.1/50088 458574875 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 45, [I]-XX p. application/pdf Massachusetts Institute of Technology
collection NDLTD
language English
format Others
sources NDLTD
topic Sloan School of Management.
Mechanical Engineering.
Leaders for Manufacturing Program.
spellingShingle Sloan School of Management.
Mechanical Engineering.
Leaders for Manufacturing Program.
Sosa Rangel, Miguel Ernesto
Implementing various lean methodologies and creating a business development plan at an ABB Greenfield site
description Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2009. === Includes bibliographical references (p. XX). === As part of its strategic initiatives, ABB inaugurated a 100,000 sq-m campus for an Engineering, Sourcing, and Manufacturing Operations center in San Luis Potosi (SLP), Mexico in May 2008. The ramp-up of the SLP site encompassed two focus areas that are the topics for this thesis. The first area of focus was to create a business development guide that supports Mexican and North American division managers, plant managers, and their supporting personnel to successfully establish new business in SLP. Having such a guide available is expected to reduce start-up time of operations, increase decision-making speed, improve productivity in multi-divisional projects, and ultimately increase potential internal business opportunities. This thesis presents a case study on how this guide was designed, developed, and implemented. The second focus area was to implement several Lean principles, the most significant one being "5S." A case study on its planned application, procedure to measure implementation level and effectiveness on quality, productivity, and on-time delivery is discussed. A discussion on the stronger emphasis by management on implementation measurement versus effectiveness measurement and possible reasons for this gap of expectations is also presented. Finally, the production area for the Robot Refurbishment line was redesigned based on the target of reducing factory floor space for use in other ventures, meanwhile simultaneously increasing lead times in the manufacturing process. === by Miguel Ernesto Sosa Rangel. === S.M. === M.B.A.
author2 Stanley B. Gershwin and Roy E. Welsch.
author_facet Stanley B. Gershwin and Roy E. Welsch.
Sosa Rangel, Miguel Ernesto
author Sosa Rangel, Miguel Ernesto
author_sort Sosa Rangel, Miguel Ernesto
title Implementing various lean methodologies and creating a business development plan at an ABB Greenfield site
title_short Implementing various lean methodologies and creating a business development plan at an ABB Greenfield site
title_full Implementing various lean methodologies and creating a business development plan at an ABB Greenfield site
title_fullStr Implementing various lean methodologies and creating a business development plan at an ABB Greenfield site
title_full_unstemmed Implementing various lean methodologies and creating a business development plan at an ABB Greenfield site
title_sort implementing various lean methodologies and creating a business development plan at an abb greenfield site
publisher Massachusetts Institute of Technology
publishDate 2009
url http://hdl.handle.net/1721.1/50088
work_keys_str_mv AT sosarangelmiguelernesto implementingvariousleanmethodologiesandcreatingabusinessdevelopmentplanatanabbgreenfieldsite
_version_ 1719039440894033920