Management of design and construction processes of the Boston Harbor project
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1996. === Includes bibliographical references (leaves 92-95). === by Osman F. Biranis. === M.S.
Main Author: | Biranis, Osman F. (Osman Ferit) |
---|---|
Other Authors: | Charles H. Helliwell, Jr. |
Format: | Others |
Language: | English |
Published: |
Massachusetts Institute of Technology
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/41339 |
Similar Items
-
Construction methods used on the East Boston Traffic Tunnel under Boston Harbor
by: Kalman, Jack R
Published: (2007) -
Sediment resuspension in Boston harbor
by: Ravens, Thomas M. (Thomas Michael)
Published: (2005) -
Contaminated sediment transport in Boston Harbor
by: Lee, Jeng-Jong
Published: (2005) -
Fluxes of organic pollutants from the sediments of Boston Harbor
by: Chen, Xiaowen
Published: (2005) -
Strategic visitor & ferry management plan : Boston Harbor Islands National Park Area
by: Moriarty, Bradley Marshall, 1969-
Published: (2013)