A business planning model to access the tradeoff between inventory and capacity for a Stage 1 manufacturing process
Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1995, and Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1995. === Includes bibliographical references (p. 83-85). === by James A. Colgan. === M.S.
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | English |
Published: |
Massachusetts Institute of Technology
2005
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/11365 |