The Process And Feasibility Of Building Deconstruction: A Case Study In Ankara
Today because of changes in the zoning plans, structural problems, building obsolescence and owner&rsquo === s wishes, old buildings are being demolished to erect newer, larger and taller ones. The objective of this study was to investigate the process and feasibility of building deconstruction....
Main Author: | Cakici, Fatma Zehra |
---|---|
Other Authors: | Elias-ozkan, Soofia Tahira |
Format: | Others |
Language: | Eng |
Published: |
METU
2005
|
Subjects: | |
Online Access: | http://etd.lib.metu.edu.tr/upload/3/12606301/index.pdf |
Similar Items
-
Fundamentals of Building Deconstruction as a Circular Economy Strategy for the Reuse of Construction Materials
by: Gaetano Bertino, et al.
Published: (2021-01-01) -
Disassembly And Re-use Of Building Materials: A Case Study On Salvaged Timber Components
by: Isik, Aydin
Published: (2003) -
BIM-Based End-of-Lifecycle Decision Making and Digital Deconstruction: Literature Review
by: Arghavan Akbarieh, et al.
Published: (2020-03-01) -
Multiobjective Mathematical Programming Model for the Optimization of End-of-Life Buildings’ Deconstruction and Demolition Processes
by: Dimitrios Aidonis
Published: (2019-03-01) -
Deconstructing the Children’s Art Pavilion
by: Chris Tucker
Published: (2014-02-01)